#TBD : 34989786
5 Days Left
Bridge Work
West Bengal
6.24 Lacs
Due on : 06 Aug, 2025
Supply And Fixing Of Flex- Vinyl Flex- Banners Etc. In Different Hoarding Structure Of Vidyasagar Setu Hrbc/jpmw/sr/03/25-26
#TBD : 34925212
3 Days Left
Bridge Work
Uttar Pradesh
2.58 Crore
Due on : 04 Aug, 2025
Construction Of 1500 Mm Dia Rcc Pile Work Of 2-lane Bridge At Over Yamuna River Hasanpur District Palwal Haryana To Malav -district Aligarh Between
#TBD : 34990533
5 Days Left
Bridge Work
West Bengal
3.32 Lacs
Due on : 06 Aug, 2025
Patch Repair Of Wearing Course Of Ajc Bose Road Flyover For The Year 2025-26 - East Bound Including Beck Bagan. Hrbc/jpmqcmd/nit/03/25-26
#TBD : 34990797
5 Days Left
Bridge Work
West Bengal
4.00 Lacs
Due on : 06 Aug, 2025
Patch Repair Of Wearing Course Of Ajc Bose Road Flyover For The Year 2025-26 - West Bound. Hrbc/jpmqcmd/nit/03/25-26
#TBD : 34969585
6 Days Left
Bridge Work
Uttar Pradesh
24.17 Lacs
Due on : 07 Aug, 2025
Supply Of 10 Mm, 20 Mm Stone Grit Kabrai And C-sand F.m. 2.5 Ken Rive Banda At Rob 32c Athsarai
#TBD : 34970268
17 Days Left
Bridge Work
Uttar Pradesh
50.21 Lacs
Due on : 18 Aug, 2025
Construction Of Approach Road Work At Lower Ganga Canal/parallel Lower Ganga Canal On Alampur-sankra Marg Mdr-82
#TBD : 34958102
17 Days Left
Bridge Work
Uttar Pradesh
65.80 Lacs
Due on : 18 Aug, 2025
Supply, Filling And Compaction Of Fly Ash Work At Construction Of 02 Lane Railway Over Bridge Crossing No. 546 Mathura Palwal Rail Section On N.h.-19 Dautana Nandgaon Barsana Marg
#TBD : 34941319
17 Days Left
Bridge Work
West Bengal
11.20 Lacs
Due on : 18 Aug, 2025
Repairing Of Potholes And Small Depressions At Hastings Approaches And All Interchanges Of Kolkata Side Of Vidyasagar Setu For The Year Of 2025-2026. Hrbc/jpmw/sr/02/25-26
#TBD : 34981281
11 Days Left
Bridge Work
Orissa
Ref. Document
Due on : 12 Aug, 2025
Integrated Development Of Satkosia Under Sasci Scheme
#TBD : 34924451
0 Days Left
Bridge Work
Uttar Pradesh
31.79 Lacs
Due on : 30 Jul, 2025
Shifting Of Electric Pole And Electric Line 11kv Shifting Of Electric Pole And Electric Line 11kv At Etah Chungi Chauraha