#TBD : 35010344
8 Days Left
Bridge Work
Uttar Pradesh
1.50 Lacs
Due on : 11 Aug, 2025
Gem Bids For Annual Maintenance Services For Waterpurification And Conditioning System Version 2 - Rowater Plant With Filter For Drinking Water Capacity 250 Lph; 5to 7; Package-4 : Water Purifier And Conditioning Systemmaintenance Involving Basic Servicing, ..
#TBD : 34910385
0 Days Left
Bridge Work
Uttar Pradesh
151.52 Crore
Due on : 28 Jul, 2025
Engineering, Procurement And Construction Work Of 04 Lane Railoverheadbridge, 04 Lane Flyover On Gt Road And 02 Lane Flyover On Ghantaghar Road In Lieu Of Level Crossing No. 02 Special Nearjarib Chowki Of Kanpur-anwarganj-rawatpur Railway Section
#TBD : 34997273
17 Days Left
Bridge Work
Uttar Pradesh
51.32 Crore
Due on : 20 Aug, 2025
Design And Construction Of Main Bridge Railway Portion Of Rail Overbridge On Lc No. 8 Special 2t At Railway Km 17.372 On Laxman Bihar Para Road Near Jalalpur Gate Located At Rajajipuram
#TBD : 34911358
4 Days Left
Bridge Work
Uttar Pradesh
14.54 Lacs
Due on : 07 Aug, 2025
Supply Of Crushed Stone Grit 10mm 20mm And Washed Coarse Sand At Construction Of 02 Lane Rob On Lxing No 42 Tabita Titauda Bhangela Road Between Sakoti Khatauli Railway Stations On Gzb Sre Rail Section On Dfcc Route
#TBD : 34969585
4 Days Left
Bridge Work
Uttar Pradesh
24.17 Lacs
Due on : 07 Aug, 2025
Supply Of 10 Mm, 20 Mm Stone Grit Kabrai And C-sand F.m. 2.5 Ken Rive Banda At Rob 32c Athsarai
#TBD : 34924451
0 Days Left
Bridge Work
Uttar Pradesh
31.79 Lacs
Due on : 30 Jul, 2025
Shifting Of Electric Pole And Electric Line 11kv Shifting Of Electric Pole And Electric Line 11kv At Etah Chungi Chauraha
#TBD : 34909737
8 Days Left
Bridge Work
Uttar Pradesh
3.66 Crore
Due on : 11 Aug, 2025
Approach Road Work At Minor Bridge Over Brij Vihar Surya Nagar Nala Pulia In Industrial Area
#TBD : 34970268
15 Days Left
Bridge Work
Uttar Pradesh
50.21 Lacs
Due on : 18 Aug, 2025
Construction Of Approach Road Work At Lower Ganga Canal/parallel Lower Ganga Canal On Alampur-sankra Marg Mdr-82
#TBD : 34958102
15 Days Left
Bridge Work
Uttar Pradesh
65.80 Lacs
Due on : 18 Aug, 2025
Supply, Filling And Compaction Of Fly Ash Work At Construction Of 02 Lane Railway Over Bridge Crossing No. 546 Mathura Palwal Rail Section On N.h.-19 Dautana Nandgaon Barsana Marg
#TBD : 34925212
1 Days Left
Bridge Work
Uttar Pradesh
2.58 Crore
Due on : 04 Aug, 2025
Construction Of 1500 Mm Dia Rcc Pile Work Of 2-lane Bridge At Over Yamuna River Hasanpur District Palwal Haryana To Malav -district Aligarh Between