#TBD : 34899961
0 Days Left
Power Plant
Jharkhand
Ref. Document
Due on : 11 Aug, 2025
Painting Of Different Equipment I.e. Junction Boxes, Marshalling Boxes, C.t. Bottoms, Isolator Mechanism Boxes, Breaker Junction Boxes Etc. Alongwith Different Switchyard Structures Under Transmission Sub-division
#TBD : 34840646
0 Days Left
Power Plant
Jharkhand
1.16 Crore
Due on : 04 Aug, 2025
Design , Engineering , Supply Of Materials / Equipment , Erection , Testing And Commissioning Of Lilo Of 132 Kv D/c Madanpur - Pakur Transmission Line At 132/33 Kv Gss , Amrapara On Turnkey Basis
#TBD : 34811844
0 Days Left
Power Plant
Jharkhand
18.88 Lacs
Due on : 31 Jul, 2025
Deployment Of Surveyor To Carry Out Detailed Survey Transmission Line Infringing At Different Locations F Under Construction Nh 143d From Ch. 59.300 To Ch. 149.500 And Nh 43 In Between Ch. 0+000 To Ch. 32.370
#TBD : 34766907
0 Days Left
Power Plant
Jharkhand
Ref. Document
Due on : 28 Jul, 2025
Work Of Regular Watching/patrolling Of 400 Kv D/c Qm Latehar -chandwa Transmission Line W.e.f. 01/08/2025 To 31/03/2026 Along With Transportation Of Mandatory Spare Materials Of 400 Kv Chandwa-essar D/c Transmission Line From Gis Chandwa (pgcil) To 400/220/132 Kv Gss
#TBD : 34766736
0 Days Left
Power Plant
Jharkhand
2.49 Crore
Due on : 31 Jul, 2025
Implementation Of Automated Fault Analysis System (afas) And Remote Accessibility System (ras) In Jusnl System Including Supply, Installation, Commissioning And Testing Of Afas Software Licenses At Four Substations Under Jusnl System
#TBD : 34766564
0 Days Left
Power Plant
Jharkhand
25.80 Lacs
Due on : 30 Jul, 2025
Deployment Of Surveyor To Carry Out Detailed Survey & Estimate For The Transmission Line Required For 04 Nos. Railway Owned Tss At Tatisilwai, Lodhma, Lohardaga & Bano In Connection With 2x25 Kv Up Gradation Work.
#TBD : 34747546
0 Days Left
Power Plant
Jharkhand
Ref. Document
Due on : 18 Jul, 2025
Compete Underground Electrical Wiring Of B Type Single Unit Quarter And D-type 04 Nos. Quarter At Residential Colony At 132/33 Kv Gss
#TBD : 34724726
0 Days Left
Power Plant
Jharkhand
1.60 Lacs
Due on : 07 Jul, 2025
Supply & Installation Of 1.5 Ton 3 Star Split Type Air Conditioners (qty 04 Nos.) (make: Lg/voltas/ Daikin/hitachi/lloyd/blue Star) At Jusnl Hq., Kusai Colony
#TBD : 34710544
0 Days Left
Power Plant
Jharkhand
Ref. Document
Due on : 15 Jul, 2025
Design , Engineering , Supply , Installation , Testing And Commissioning Of 220/132 Kv Grid Substations At Jadugoda And Additional 132 Kv Bays At Dhalbhumgarh Gss Along With Dismantling Works
#TBD : 34703259
0 Days Left
Power Plant
Jharkhand
95.28 Lacs
Due on : 15 Jul, 2025
Construction Of Retaining Wall And Boundary Wall Along With Boulder Crating Work Behind Quarters At 132/33 Kv G/s/s , Meral