Work Of Regular Watching/patrolling Of 400 Kv D/c Qm Latehar -chandwa Transmission Line W.e.f. 01/08/2025 To 31/03/2026 Along With Transportation Of Mandatory Spare Materials Of 400 Kv Chandwa-essar D/c Transmission Line From Gis Chandwa (pgcil) To 400/220/132 Kv Gss