Upkeeping And Preventive Electrical Maintenance Works Related To Lt Switchgear, Dry Type Transformers 2.5mva, And Nspbds, Lt Motorsmax 110kw And Lt Boards Max 4000a Like Mldb, Wrdb In The Bop/ytps 5x800 Mwarea Such As A Raw Water Pump House, Clarifier, Dm Plant, Cpu, Foph, Rail Unloadingfoph, Pt Plant, Fire Water Pump House, Dm Transfer Pump House, Foam Pump House, Chemical Labs And Raw Water Chlorination Plant Etc From The Date Of Commencement Of Work To A Period Of Three Months For The Fy 2025-26.