Construction Of Rob In Lieu Of Lc No 138 At Km: 228/266 As 1x42.0 M Composite Girder Railway Portion As Railway Span + 18x18.71 M Psc Girder And Rcc Retaining Wall Approach Portion Between Ajjampur And Nagavangal Staions And Proposed Construction Of Lhs In Lieu Of Lc No.138 At Km.228/266 As 1x5.5x2.5 M Rcc Box Including Electrical Works. Composite Work