Fabrication And Erection Of Shed With Rolling Shutter Assembly At The Barrel Situated At Left Bank Of Gomati River From Amar Shahid Path To Gomati Aquaduct At Km 1.300 Including All Cost Of Material, T&p And Consumables Etc. For Proper Completion Of Work Required As Per Site Condition And Specification. Work Will Be Carried Out As Per Bill Of Quantity And Direction Of Engineer-in-charge