Construction Of 07 Nos. New 125mm X 40mm Dia X 61 Meter Deep Hand Operated T/well And 43 Nos. New 125mm X45 Meter Deep Gravel Packed T/w With India Mark Hand Pump With Platform, Drain And Soakpit In Place Of Defunct T/w In Drought Area Under Ph Division