Supply Of Material, Design, Fabrication, Installation And Commissioning Of Seamless Ss Compr Essed Air Pipeline At New Ioh Shed, Roh Shed & 140T Crane Area Kota With Fittings As Per Attached Annexu Re A, B, C, D & Drawing. Minimum Sustainable Pressure Of Pipe Line 10 Kgf/Cm2 Note- 1. Bidder Shall Submit / Attach Their Remarks Against Each Of The Specifications/ Parameters Whether Compiled Or Not. If Not, Mentio N The Deviation Clearly In The Attached Format Of Annexure A, B&C. 2. Nabl/Govt., Approved Lab -Certificate R Equired Of Pipe Line & Fittings At The Time Of Commissioning Make-Jindal/Similar Warranty-30 Months From Th E Date Of Commissioning Warranty Period: 30 Months After The Date Of Delivery