Removal And Refixing Of Insulatin Either Damaged Or Required For Repair Works On Fg, Pa, Sa Duct Walls Raph, Valves, Valves Piping, Water Wall Tubes Around Soot Blowers, Steam Headers And Dampers Etc Of Units 5 & 6 As And When Required And Including Annual Overhaul Period During Year 2024-25