#TBD : 33424975
8 Days Left
Security Services
Ladakh
47.12 Lacs
Due on : 12 Dec, 2024
Provision Of Electric Supply To Various Units In Tangtse Mil Stn
#TBD : 33417239
0 Days Left
Construction
Ladakh
1.20 Lacs
Due on : 03 Dec, 2024
Providing and installation of electric submersible pump at Chanchik Plot and Thaskan Grong Plot at Kurbathang (Under CCDF 2024-25).
#TBD : 33425070
14 Days Left
Security Services
Ladakh
Ref. Document
Due on : 18 Dec, 2024
Supply Of Wall Paper Roll, Maple Plant, Plastic Pot Large, Roof Mat Green, Fountain Buddha, Foam Wall Paper, Wc White With Flush, Angle Cock, Bib Cock, C Hole Mixer Fountain, Health Faucet, Towel Ring, Paper Holder, Towel Rack, Waste Coupling Pop, Vanity Box With Wash Basin, Corner Glass Shelf, Wash Basin Assessories, Jhalar, Bed Sheet, Centre Table Runner, Panasonic Light, Ladakhi Flag, Flower Pot, Led Light, Cloth, Mating Foam, Round Table Cover, Table Runner, Table Mat, Table Napkin Cloth, Napkin Cloth Ring, Stand Bowl
#TBD : 33413727
14 Days Left
Security Services
Ladakh
Ref. Document
Due on : 18 Dec, 2024
Supply of 18 Nozzle Delivery Valve Pump Element
#TBD : 33413002
14 Days Left
Education And Research Institutes
Ladakh
Ref. Document
Due on : 18 Dec, 2024
Supply of 1 Search String: Puff Insulated Metal Siding
#TBD : 33411067
14 Days Left
Education And Research Institutes
Ladakh
Ref. Document
Due on : 18 Dec, 2024
Supply of 7358 Heat cable Eltherm German , Full insulation 5 layers , Half
Insulation 3 layers , Piping PPR Thermax , Sintex insulation ,
Plumbing and Installation , Wiring and MCB , Taps and
Fitting
#TBD : 33417216
0 Days Left
Construction
Ladakh
15.52 Lacs
Due on : 03 Dec, 2024
Construction Of Channel/ Ground Leveling And Balance Work Of Chain Link Fencing Around Fish Form Thasgam Drass. Under Capex.
#TBD : 33417286
0 Days Left
Power Plant
Ladakh
8.00 Lacs
Due on : 02 Dec, 2024
Supply, Installation, testing and Commissioning for Improvement of LT Network at various identified locations within the jurisdiction of Electric Distribution Division Kargil UT- Capex- 2024-25
#TBD : 33411749
0 Days Left
Road Work
Ladakh
263.51 Crore
Due on : 03 Dec, 2024
Constr And Upgradation Of Rd Khalsar Agham Shyok To Dl Fm Agham Towards Shyok, Fm Existing Chainage Km 34.140 To Km 70.150 Design Chainage Km 32.040 To Km 66.620 Net Length 34.580 Km On Epc Mode Under Project Himank
#TBD : 33413173
14 Days Left
Security Services
Ladakh
Ref. Document
Due on : 18 Dec, 2024
Supply of 38 Matress Water Glass Weighing Machine Kanath Salt Pot Durrie