Axle Pulley Tenders | Latest Tenders for Axle Pulley
Total 297 Axle Pulley tenders found
Tender Bidding Website covers all Tenders for Axle Pulley – Including Axle Pulley Government Tenders, e Tender Axle Pulley, Axle Pulley Tenders and Private Tenders. There is no shortage of business opportunities from the largest Axle Pulley Tender Database.
Our website allows you to find Axle Pulley tenders online quickly and easily.
Subscribers can also opt to receive daily tender alerts through email from TenderBidding.com to guarantee they don't miss out on any opportunities.
Supply of %U201cstud For V Groove Assembly Complete With Hex Nut, Split Pin, Lock N Ut, End Plane Washer For 4.5 Kw Brushless Alternator As Per Rdso Drawing No.Sk.El-3883, Ait5, Item N O.-2 To 6 Or Icf Drg. No.- Icf/Sk- 9- 0-880, Alt.- B/Nil, Item No.- 2 To 6.And Mechanical Properties Is As P Er Is: 1598-1977 And Is: 1608- 1972.%U201d Warranty Period: 30 Months After The Date Of Deliver Y
View
Bidding
Gem Registration
Download
#TBD : 33013407
4 Days Left
Railway Transport
Assam
Ref. Document
Due on : 14 Oct, 2024
Supply Of AxlePulley For Dbws Shunting Engine Chetak As Per Drawing Attached. Warr Anty Period: 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 33005695
8 Days Left
Railway Transport
West Bengal
Ref. Document
Due on : 18 Oct, 2024
Supply of Fastener Assembly For AxlePulley Of Ac & Non-Ac Coaches As Per Rdsos Drg. No. Skel -3652, Alt.-3 Item No. 3, 4, 5, 6 & 7 In Assembled Condition.Material Specification Of Item No 3Stud To Be Read As Steel Grade 45C8 As Per Is: 1570 Part 2/Sec 1 - 1979, Instead Of Current Entry In Drawin G. Warranty Period: 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 33004887
25 Days Left
Railway Transport
Uttar Pradesh
Ref. Document
Due on : 04 Nov, 2024
Supply of Four V Deep Groove AxlePulley Assembly For Brushless 4.5 Kw Alternators As Per Icf Dr G.No.- Icf/Sk9-0-880, Alt-B/Nil, Col-I Or Rdso Drg.No.- Skel-3883, Alt- 5, Col-I And Rdso Spec. No. Elp S/Spec/Tl/13 Of March -1998. Warranty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitt Ed: Max 8 Lacs
View
Bidding
Gem Registration
Download
#TBD : 32992536
4 Days Left
Railway Transport
Karnataka
Ref. Document
Due on : 14 Oct, 2024
Supply of Rubber Pad For 6 Grooved AxlePulley For 18/25Kw Alternator As Per Rdso Drg No. Skel- 4021 Alt 2. Warranty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitt Ed: Max 8 Lacs
View
Bidding
Gem Registration
Download
#TBD : 32969195
0 Days Left
Railway Transport
West Bengal
Ref. Document
Due on : 03 Oct, 2024
Supply of Rubber Pad For AxlePulley Of 4.5 Kw Alt., Size: 18Mmx160mmx230mm, As Per Rdsos Drg. No.Skel-3883, Alt.-4, Made Of Polychloroprene Rubber Compound Grade-F, Conforming To Properti Es As Laid Down In Clause 3.2.4.1 And Clause 3.24.2 Of Irs Spec. No. R-48-88. Material Is To Be Procured From Rdso Recommended Sources Vide Rdso Letter No. El/1.6.9.15 Dt. 03.09.2014. Warranty Perio D: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitt Ed: Max 8 Lacs
View
Bidding
Gem Registration
Download
#TBD : 32928706
0 Days Left
Railway Transport
Assam
Ref. Document
Due on : 30 Sep, 2024
Supply of Polychloropene Rubber Grade-F Pad Of Size 240Mm X 210Mm X 18Mm For + 0 - 1 Mm For V Grooved AxlePulley Of 25 Kw Alternators. As Per Rdsos Drg.No.Skel 4021 Alt. 2. The Material Should Be As Per Laid Down Clause No. 3.2, 4.1 & 3.2, 4.2 As Mentioned In Irs R-48-88 Warranty Per Iod: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitt Ed: Max 8 Lacs
View
Bidding
Gem Registration
Download
#TBD : 32917023
0 Days Left
Railway Transport
Telangana
Ref. Document
Due on : 04 Oct, 2024
Supply of V Deep 6 Grooved AxlePulley As Per Rdso Drg. No. Skel-3652, Col%U2013i, Alt-3 And Conforming To Rdso Specification No. Elps/Spec/Tl/13 March 1998, Suitable For 18/25 Kw Brushless Alternator. However, The Firm S May Quote For Latest Specn./Drawing With Amendment, If Any, Issued By Rdso/Icf/Rcf. Warranty Period: 30 M Onths After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 32912470
11 Days Left
Railway Transport
Orissa
Ref. Document
Due on : 21 Oct, 2024
Supply of Deep V Grooved AxlePulley For 25Kw, 110V Brushless Alternator As Per Rdso S Specific Ation No: Elps/Spec/Tl/13, March-1998 & Rdso S Drg. No. Skel-3652, Alt-3. The AxlePulley Will Be As Per Col.1, 16.25T Axle. Rubber Pad Shall Be As Per Rdso Drawing No. 4021 Alt. 2. Warranty Perio D: 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 32911645
0 Days Left
Railway Transport
Uttar Pradesh
Ref. Document
Due on : 04 Oct, 2024
Supply of Cast Iron AxlePulley In Two Halves 6 Groove For 25 Kw Alternator Without Rubber Packing Padalongwith Hardware Like Stud Nut Washer Etc Complete To Rdso Specn No.Elps-Spec-Tl-13 And R Dso Drg No Skel-3652 Alt-1 Warranty Period: 30 Months After The Date Of Delivery