Arcing Horn Tenders | Latest Tenders for Arcing Horn
Total 37 Arcing Horn tenders found
Tender Bidding Website covers all Tenders for Arcing Horn – Including Arcing Horn Government Tenders, e Tender Arcing Horn, Arcing Horn Tenders and Private Tenders. There is no shortage of business opportunities from the largest Arcing Horn Tender Database.
Our website allows you to find Arcing Horn tenders online quickly and easily.
Subscribers can also opt to receive daily tender alerts through email from TenderBidding.com to guarantee they don't miss out on any opportunities.
Supply of Stationary Contact To S.Rly Drg. No. Sr/D/Et-32/Bm Alt.2 Warranty Period: 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 31437089
0 Days Left
Railway Transport
Uttar Pradesh
Ref. Document
Due on : 20 Mar, 2024
Supply of For Et-1 And Et-2 Along With Accessories As Per Drg. No. Els/Vskp/2008/11. Each Set Consisting Of S.N. 1 To 8 As Per Drg. ArcingHorn For Et-1 And Et-2 Along With Accessories As Per Drg. No. Els/Vskp/2008/11. Each Set Consisting Of S.N. 1 To 8 As Per Drg Warranty Period: 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 31387904
0 Days Left
Railway Transport
Orissa
Ref. Document
Due on : 18 Mar, 2024
Supply of Split Type ArcingHorn Of Auxiliary Transformer Warranty Period: 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 31281635
0 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 25 Mar, 2024
Supply Of ArcingHorn For 400 Kv Suspension Towers Of 400 Kv Lines At 400 Kv Sub Station
View
Bidding
Gem Registration
Download
#TBD : 30623720
0 Days Left
Railway Transport
Delhi
Ref. Document
Due on : 23 Jan, 2024
Procurement Of Earthing Contact4lever M.S.Flat 40X6 Lever With Overall Length 268 Mm. Lever With Overall Length 230 Mm. Lever With Overall Length 114 Mm. Operating Rod Insulator Bottom Link Along With M14 Nut, M12x 50 Mm Lg/ Bolt. Operating Insulator Top Link Along With M14 Nut, M12x 50 Mm Lg/ Bolt & 2 Nos. Brass Bush. Moving Blade ArcingHorn Dia 10 Along With Horn Mount 31X6. Fixed Blade ArcingHorn. Stopper For Moving Blade. Earth Blade Tandom Pipe. Operating Rod Insulator Shaft Link 50X6. Operating Rod Insulator Shaft Link Pin Dia 12X50 Bolt. Flexible Electrolytic Braiding 100Sqmm.
View
Bidding
Gem Registration
Download
#TBD : 30435122
0 Days Left
Power Plant
Andhra Pradesh
Ref. Document
Due on : 16 Jan, 2024
Supply Of ArcingHorn Suitable For 400Kv Double I Suspension Hardware Fitting At Powergrid Kadapa Ss Q3 Supply Of ArcingHorn Suitable For 400Kv Quad Tension Hardware Fitting At Powergrid Kadapa Ss Q3
View
Bidding
Gem Registration
Download
#TBD : 30143523
0 Days Left
Railway Transport
Bihar
Ref. Document
Due on : 11 Dec, 2023
10 Kva, 25 Kv/240V, 1-Phase, Oil Type At Complete In All Respect With Modified Antibird Fault ArcingHorn Arrangement As Per Rdso Spec. No. Eti/Psi/15/8/03 Or Latest Warranty Period: 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 29944269
0 Days Left
Railway Transport
Bihar
Ref. Document
Due on : 14 Nov, 2023
Supply of 10 Kva, 25 Kv/240V, 1-Phase, Oil Type At Complete In All Respect With Modified Antibird Fault ArcingHorn Arrangement As Per Rdso Spec. No. Eti/Psi/15/8/03 Or Latest Warranty Period: 30 Months After The Date Of Delivery 10 Kva, 25 Kv/240V, 1-Phase, Oil Type At Complete In All Respect With Modified Antibird Fault ArcingHorn Arrangement As Per Rdso Spec. No. Eti/Psi/15/8/03 Or Latest Warranty Period: 30 Months After The Date Of Delivery 10 Kva, 25 Kv/240V, 1-Phase, Oil Type At Complete In All Respect With Modified Antibird Fault ArcingHorn Arrangement As Per Rdso Spec. No. Eti/Psi/15/8/03 Or Latest Warranty Period: 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 29902242
0 Days Left
Railway Transport
Tamil Nadu
Ref. Document
Due on : 07 Nov, 2023
Supply of ArcingHorn To M/S.Repl Part No S2531 And To Drg No. Am-304070-P1 Or Arc Horn To Ae Part No.G2531 And To Drg.No.9919000033001. Warranty Period: 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 29725243
0 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 30 Oct, 2023
Supply of ArcingHorn Complete For Shunting Contactor As Per Clw Drg. No. 4Twd.111.063 Alt-7. Warranty Period: 30 Months After The Date Of Delivery