Tender Bidding Website covers all Tenders for Arc Chute – Including Arc Chute Government Tenders, e Tender Arc Chute, Arc Chute Tenders and Private Tenders. There is no shortage of business opportunities from the largest Arc Chute Tender Database.
Our website allows you to find Arc Chute tenders online quickly and easily.
Subscribers can also opt to receive daily tender alerts through email from TenderBidding.com to guarantee they don't miss out on any opportunities.
Supply of For L1 Plus 2 Arcing Chamber For L1 Plus 2, Clw Drg.No.1Twd.112.005, Clw Spec.No.4 Tes. 111.019 Alt.3. Warranty Period: 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 31664897
16 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 13 May, 2024
Supply of ArcChute To Blw Drg.No. 9570152 Alt. Ni Blw Pt.No.18140154 Spec. Wdg4/El/Ps-09- R1 Warranty Period: 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 31659534
9 Days Left
Railway Transport
Andhra Pradesh
Ref. Document
Due on : 06 May, 2024
Supply of ChuteArc - High Capacity To Emd Pt. No. 9577680.
View
Bidding
Gem Registration
Download
#TBD : 31656806
19 Days Left
Railway Transport
West Bengal
Ref. Document
Due on : 16 May, 2024
Supply of ArcChute For Cgrarcing Chamber Complete For N-32 Tap Changer, Rdso Drg. No. Skel/4675 Alt.1, M/S. Repl Pt. No. S-27 Or Ae Pt No. G-27 Warranty Period: 30 Months Aft Er The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 31637410
5 Days Left
Railway Transport
Tamil Nadu
Ref. Document
Due on : 02 May, 2024
Supply of ArcChute Assembly For Shunting Contactor To Clw Drg. No. 1Twd.111.110 Alteration-9 And Confir Ming To Clw Specfication No. 4Tes-111- 019 Alteration-3 Warranty Period: 30 Months After The Date Of Deliver Y
View
Bidding
Gem Registration
Download
#TBD : 31628773
16 Days Left
Railway Transport
Karnataka
Ref. Document
Due on : 13 May, 2024
Supply of Chute Assembly Arc To Emd Part No.9570152 To Blw Part No.18140154 Warranty Period: 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 31621538
30 Days Left
Railway Transport
Tamil Nadu
Ref. Document
Due on : 27 May, 2024
Supply of ArcChute Assembly For C-145 Contactor To Clw Drg. No. 1Twd/113/042, Alt-2 Warranty Period : 30 Months After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 31586269
0 Days Left
Railway Transport
Tamil Nadu
Ref. Document
Due on : 25 Apr, 2024
Supply of Chute Assembly Arc To Emd Part No. 9570152 To Blw Part No. 18140154 For Hhp Locos Warranty Period: 30 M Onths After The Date Of Delivery
View
Bidding
Gem Registration
Download
#TBD : 31546668
0 Days Left
Railway Transport
Bihar
Ref. Document
Due on : 12 Apr, 2024
Supply of Chute Assembly Arc.
View
Bidding
Gem Registration
Download
#TBD : 31476184
0 Days Left
Coal And Lignite
Chhattisgarh
21.72 Lacs
Due on : 28 Mar, 2024
Procurement of spares - Core balance transformer CBT80M , Shunt Trip Coils
11.09.03 , Base for Push Buttons BOBSOE , Current
transformer for ammeter 120_200_5_5 , Fixed contact for
breaker 300 A 11.06.00A , Overload Assembly - Breaker 30A
-100A 11.01.00A , No Volt Coil Assy Under Voltage Coil Assy
With Moulding 11_04_00A , Overload Assembly - Breaker
110A - 200A 11_01_00B , Complete control wiring including
pla relay PTDS ELM7 Control fuss control plate wiring
harness etc mounted on control plate OR Circuit breaker for
100A with complete assy WR1 , Earth Leakage Relay
50_750m A with Time Lag with CBCT ELM7LAT S 80M , CT
for O_L LAT100_5 , Arcchute AC1 , Push Button Actuator for
EL Test BOES2 , Ammeter100_5 for ACB 130_A_0_100_SO_A
, Push Button Actuator for EL Reset BOES3 , Ammeter 200_5
for ACB 130_A_0_200_SO_A , Power Cable for 100A for
Breaker Chamber IC and OG Set ICCB1 , Power Cable for
200A for Breaker Chamber IC and OG Set ICCB2 , Limit
switch NO plus NC for breaker MCR16D , Power Cable for
100A for Isolator Chamber IC and OG Set ICCI1 , CT for OL
LAT200_5 , Current transformer for ammeter 120_100_5_5 ,
Potential Transformer DS , Catcher Assembly 11_05_31 , No
Volt Coil Assy Under Voltage Coil Assy Without moulding
11_04_00 , Moving contact assy For breaker 300 amps
11_02_00 , Overload Assembly Breaker 210A _300A
11_01_00C , Isolator Assembly K3 ON_OFF 05_00_00 ,
Circuit Breaker up to 400A with complete wiring assembly
WR-2A , Current Transformer for Ammeter 120_400_5_5 ,
Indicating Lamps LAB9_ACB , on_off Isolator 300A k4 , Brass
terminal with insulator DMC T5 , Brass Terminal for OG T3 ,
CT for O_L LAT300_5 , Power Cable for 400A for Breaker
Chamber IC and OG Set ICCB4 , Power Cable for 300A for
Breaker Chamber IC and OG Set ICCB3 , Fixed contact for
breaker 11_06_04 , Brass Cone and Gland Assembly BOBCG
, Brass Cone BOBC , Isolator Micro switch Assembly
05_05_00 , Current transformer for ammeter 120_300_5_5 ,
Overload Coil 300A 11_01_04 , Overload Coil 200A
11_01_03 , Overload Coil 100A 11_01_02 , Ammeter300_5
for ACB 130_A_0_300_so_A , Moving contact finger 300A
11_02_02_300 , Fixed Contact Assembly for isolator 300A
05_30_04_00 , Potential Transformer80 VA DS1 , Busbar
BBR400 , Ammeter 400_5 for ACB 130_A_0_400_SO_A ,
Shunt Trip Assembly complete 11_03_00 , ArcChute Pillar
11_06_06 ,for Mine Line Make ACB 100A to
400A on proprietary basis