#TBD : 33122316
0 Days Left
Power
Andhra Pradesh
Ref. Document
Due on : 22 Oct, 2024
Supply, Fabrication And Erection Of 6 Nos. Steam Exhaust Pipes Of Hrh Line At El.92 Meters Of Unit-6
#TBD : 33121999
0 Days Left
Power
Andhra Pradesh
Ref. Document
Due on : 01 Nov, 2024
Reconditioning Of Damaged Spare Id Fan 2A And 2B Impeller With New Wear Plate Assembly
Type Ndzv 31 Sidor+6%.
#TBD : 33041869
0 Days Left
Power
Andhra Pradesh
Ref. Document
Due on : 19 Oct, 2024
Replacement Rectification Of Rockwell Couplings T-Pieces Reducer Pieces Ceramic Shop Bends And Orifices Of Unit 1 During Annual Overhaul For The Year 2024-25.
#TBD : 33041564
0 Days Left
Power
Andhra Pradesh
Ref. Document
Due on : 19 Oct, 2024
Replacement And Repairs Of Damaged Metallic Expansion Joints Including Seal Plates For Duct At Raph And Econonimzer Outlet Of Unit-1
#TBD : 33041852
0 Days Left
Power
Andhra Pradesh
Ref. Document
Due on : 19 Oct, 2024
Overhauling Servicing Of Various Sizes Of Valves Safety Valves And Cleaning Of Oltc Screens And Condenser Inlet Pipes Of Unit-I Turbine During Annual Overhaul For The Year 2024-25.
#TBD : 33041739
0 Days Left
Power
Andhra Pradesh
Ref. Document
Due on : 19 Oct, 2024
Cleaning And Repairing Of Flue Gas Duct And Providing Of Refractory Lining From Air Pre-Heater A And B Out Let To Chimney Of Unit I Boiler During Annual Overhaul 2024-25
#TBD : 33041872
0 Days Left
Power
Andhra Pradesh
Ref. Document
Due on : 19 Oct, 2024
Repairing Of 20Inch Spool Pieces At All Corners Of Burner Compartment Of Boiler Of Unit 1 During Annual Overhaul For The Year 2024-25.
#TBD : 33041648
0 Days Left
Power
Andhra Pradesh
Ref. Document
Due on : 19 Oct, 2024
Overhauling Of Air Preheater Of Unit I During Annual Overhaul Period For The Year 2024-25
#TBD : 33041849
0 Days Left
Power
Andhra Pradesh
Ref. Document
Due on : 19 Oct, 2024
Labour Charges For Removal And Refixing Of Insulation And Cladding To Various Pipes And Equipment At Various Locations In Unit-I During The Year 2024-25
#TBD : 33041839
0 Days Left
Power
Andhra Pradesh
Ref. Document
Due on : 19 Oct, 2024
Repairing Of 22 Inch Coal Pipes From All Corners Of Boiler To Classifier Outlet Gates Of Mills Of Unit 1 During Annual Overhaul For The Year 2024-25.