#TBD : 31668063
45 Days Left
Power
Uttaranchal
6.03 Crore
Due on : 11 Jun, 2024
Supply Installation Testing And Commissioning Of Infrastructure Works Loss Reduction On Turnkey Basis Under Revamped Reforms-Linked Results-Based Distribution Sector Scheme
#TBD : 31645572
0 Days Left
Power Plant
Uttaranchal
149.56 Crore
Due on : 24 Apr, 2024
Supply, Installation, Commissioning And Implementation Of Early Warning Systems Ews In The Catchment Area Of Naitwar Mori Hydro Power Station 60 Mw, Bainol, P.O. Mori
#TBD : 31658699
17 Days Left
Power Plant
Uttaranchal
12.20 Lacs
Due on : 14 May, 2024
Supply Of Tools - Chain Pulley Block 5 Ton 3 Meter, D Shackle 4.5 Ton, D Shackle 6.5 Ton, D Shackle 8.5 Ton, 10 Mm Steel Wire Rope, 12 Mm Steel Wire Rope, 18 Mm Steel Wire Rope, Poly Propylene Rope 12 Mm, Poly Propylene Rope 16 Mm, Poly Propylene Rope 20 Mm, Ac High Voltage Non Contact Proximity Detectors, Electrical Resistance Hand Gloves, Full Body Double Lanyard Harness, Detachable Type Rope Grab Fall Arrestors With Connectors And Rope, Retractable Wire Rope Fall Arrestor Blocks, Tree Pruner 390 Cm, Power Chain Saw Carbide Chain Saw, Hand Held Emergency Light, Binocular, Earth Ground Tester, Digital Megger, Welding Set 200 Amp With Battery Back Up, Petrol Genset 2800 Va For Transmission Line
#TBD : 31668012
45 Days Left
Power
Uttaranchal
46.88 Crore
Due on : 11 Jun, 2024
Supply Installation Testing And Commissioning Of Electrification Works Of Itbp Border Outpost Bops
#TBD : 31651956
2 Days Left
Security Services
Uttaranchal
Ref. Document
Due on : 29 Apr, 2024
Supply Of Stationary Value Regulated Lead Acid Batteries As Per Is 15549 Q3, Lead Acid Batteries For Motor Vehicles With Light Weight And High Cranking Performance As Per Is 14257:2019 Q3
#TBD : 31659474
5 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 02 May, 2024
Restoration Of Bhaghirathi River In Its Original Stream And Filling Of Diversion Channel At Barrage Site Of Lohrinagpala Hep 600Mw Discontinued In District
#TBD : 31659568
5 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 02 May, 2024
Tender for Safe Closure Of Adits, Tunnels, Surge Shaft From Gunga Gangnani To Trc Site Near Pala Of Loharinag-Pala Hep 600 Mw Discontinued In District
#TBD : 31659421
5 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 02 May, 2024
Filling Of Desilting Chamber And Desilting Tunnel And Plugging Of Adits At Barrage Site Dabrani Of Loharinag-Pala Hep 600 Mw Discontinued In District
#TBD : 31653224
16 Days Left
Power Plant
Uttaranchal
5.61 Lacs
Due on : 13 May, 2024
Providing And Fixing Of Warning Signboards For Nmhps
#TBD : 31664700
18 Days Left
Security Services
Uttaranchal
45.0 Thousand
Due on : 15 May, 2024
Supply of 25 Poly Carbonate Shield Mha V2 Q2