#TBD : 35248170
0 Days Left
Construction
Jammu And Kashmir
1.94 Lacs
Due on : 04 Sep, 2025
Devlopment Of Road From Lo Khursheed Shah To Gundar At Rawalpora Panchayat/halqa Bemnipora B Block Kaprin
#TBD : 35240671
0 Days Left
Power Plant
Jammu And Kashmir
Ref. Document
Due on : 15 Sep, 2025
Shifting Of Transformer At Maqroor Mohalla Lachipora Ward No 2 And Shifting Of Transformer At Bagh Mohalla Ward No 2 Under Ddc Grants 2025-26
#TBD : 35176333
0 Days Left
Water Supply And Drainage
Jammu And Kashmir
8.00 Lacs
Due on : 08 Sep, 2025
Providing Laying And Installation Of Water Pipes For Phe Schemes Of Rafiabad Constituency Of Phe Sub Division Sopore Under District Capex Budget 2025-2026
#TBD : 35156274
0 Days Left
Construction
Jammu And Kashmir
31.26 Lacs
Due on : 04 Sep, 2025
Balance Work Of Hpc Dangerpora
#TBD : 35156598
0 Days Left
Water Supply And Drainage
Jammu And Kashmir
47.0 Thousand
Due on : 21 Aug, 2025
Providing And Fitting Of 70 Sq Mm 3.5 Core Armoured Al Cable As Lt Line From Ht Transformer To Stage 1st Of Wss Baba Shakrudin Under Ut Capex Budget Regular
#TBD : 35158934
0 Days Left
Water Supply And Drainage
Jammu And Kashmir
5.44 Crore
Due on : 23 Aug, 2025
P L F Of Distribution Network Incld New 450mm Dia Clear Water Supply Mains And Other Transmission Network Of Different Diameters, Electro Mechanical Works Including Allied Works For Wss Sumbal Town Under Amrut 2.0 Programme With O M Of 05 Yrs. P L F Of Distribution Network Incld New 450mm Dia Clear Water Supply Mains And Other Transmission Network Of Different Diameters Electro Mechanical Works Including Allied Works For Wss Sumbal Town Under Amrut 2.0 Programme With O M Of 05 Yrs.
#TBD : 35156099
0 Days Left
Construction
Jammu And Kashmir
2.02 Lacs
Due on : 01 Sep, 2025
Construction Of Footsteps At River Ghat Near Badshah Masjid Lane And Near H/o Gh Mohi-u-din Bhat S/o Amber Bhat At Badshah Masjid Ward No 08 Mc Sopore
#TBD : 35156047
0 Days Left
Water Supply And Drainage
Jammu And Kashmir
6.73 Lacs
Due on : 21 Aug, 2025
Fabrication And Erection Of Overhead Gantry With Allied Works At Lift Wss Zaingeer Stage 1st Under Ut Capex Earlier Jkidfc
#TBD : 35155565
0 Days Left
Water Supply And Drainage
Jammu And Kashmir
10.37 Lacs
Due on : 21 Aug, 2025
Providing, Installation And Testing And Commissioning Of Various Electro-mechanical Equipment At Wss Ningli Ghat Under Ut Capex Earlier Jkidfc