#TBD : 34288476
0 Days Left
Construction
Goa
11.38 Lacs
Due on : 04 Apr, 2025
Construction Of Plum Concrete Toe Wall For Landslide Protection Below The Hill Slopes Of Xelpem Mbr At The 160mld Swtp.
#TBD : 34288528
0 Days Left
Construction
Goa
5.04 Lacs
Due on : 04 Apr, 2025
Annual Cleaning Of The Master Balancing Reservoir At Shirvoi. Annual Cleaning Of The Master Balancing Reservoir At Shirvoi. L5
#TBD : 34288490
0 Days Left
Construction
Goa
3.27 Lacs
Due on : 07 Apr, 2025
Supply And Installation Of New Electrical Wiring Along With Upgradation Of Existing Lighting Fittings At Filter House Of 160 Mld Salaulim Wtp.
#TBD : 34288524
0 Days Left
Construction
Goa
11.69 Lacs
Due on : 07 Apr, 2025
Construction Of Systematic Drainage System At The Intake Pumping Station Of The 160mld
#TBD : 34287578
0 Days Left
Construction
Goa
12.09 Lacs
Due on : 04 Apr, 2025
Supply And Installation Of Ni-cd Batteries For Dc Power Supply At Intake House Of 160mld Salauli Wtp.
#TBD : 34287612
0 Days Left
Construction
Goa
1.80 Lacs
Due on : 04 Apr, 2025
Maintenance Of 100 Mld Salauli Water Treatment Plant At Xelpem, Sanguem- Supply Of 10 Percent Naoh Solution For Chlorine Leak Neutralization At Site Of Work.
#TBD : 34287534
0 Days Left
Construction
Goa
12.09 Lacs
Due on : 04 Apr, 2025
Renovation Of The Existing Recreation Hall Building In Xelpem Wtp To Accommodate Division Office.
#TBD : 34287039
0 Days Left
Construction
Goa
4.85 Lacs
Due on : 02 Apr, 2025
Replacement Of Roof Other Miscellaneous Works To Irbn Quarters A-7/1 A-7/2 At Camp Chandreshwar
#TBD : 34287596
0 Days Left
Construction
Goa
4.85 Lacs
Due on : 02 Apr, 2025
Replacement Of Roof Other Miscellaneous Works To Irbn Quarters A-18/1 A-18/2 At Camp Chandreshwar
#TBD : 34286931
0 Days Left
Panchayat Division
Goa
5.38 Lacs
Due on : 07 Apr, 2025
Providing Pavers And Repair To The Existing Steps For Pathway At Kholuli In V.p. Kirlapal Dabal Of Sanvordem Constituency