#TBD : 31704700
2 Days Left
Construction
Maharashtra
30.50 Lacs
Due on : 09 May, 2024
Providing 36 Passenger Cum Goods Lift For Proposed Evm Vvpat Storage Godown At Shitole
#TBD : 31552940
0 Days Left
Road Transport
Maharashtra
59.88 Crore
Due on : 06 May, 2024
Treatment For Critical Land Slide Prone Spots Posing Significant Threat By Taking Slope Protection Measures From Km 144.800 To Km145.000, Km148.00 To Km 148.350, Km150.920 To Km 151.020 And Km 155.800 To Km 156.000 In Kashedi Ghat And Km 200.317 To K
#TBD : 31664088
0 Days Left
Construction
Maharashtra
30.50 Lacs
Due on : 29 Apr, 2024
Providing 36 Passenger Cum Goods Lift For Proposed Evm Vvpat Storage Godown At Shitole
#TBD : 31664201
0 Days Left
Construction
Maharashtra
6.91 Lacs
Due on : 29 Apr, 2024
Providing 63 Kva Transformer Substation For Proposed Evm Vvpat Storage Godown At Shitole
#TBD : 31664075
0 Days Left
Construction
Maharashtra
12.20 Lacs
Due on : 29 Apr, 2024
Providing Fire Alarm, Extinguishers And Pa System For Proposed Evm Vvpat Storage Godown At Shitole
#TBD : 31704704
2 Days Left
Construction
Maharashtra
12.20 Lacs
Due on : 09 May, 2024
Providing Fire Alarm, Extinguishers And Pa System For Proposed Evm Vvpat Storage Godown At Shitole
#TBD : 31518011
0 Days Left
Municipal Corporation
Maharashtra
4.23 Lacs
Due on : 26 Mar, 2024
Construction Of Rcc Gutter Pen Within Pen Municipal Council
#TBD : 31552927
0 Days Left
Road Transport
Maharashtra
56.66 Crore
Due on : 26 Apr, 2024
Strengthening Of Nh 166A To Two Lane Paved Shoulder From Km 0.000 To Km 22.200 Of Vadhkal Alibag Road For Design Length 22.200 Km In Raigad District In The State Of Maharashtra On Epc Mode
#TBD : 31664293
0 Days Left
Construction
Maharashtra
20.80 Lacs
Due on : 27 Apr, 2024
Providing Cctv Surveillane System And Street Light To Evm Vvpat Storage Godown At Shitole
#TBD : 31552928
0 Days Left
Road Transport
Maharashtra
178.29 Crore
Due on : 26 Apr, 2024
Rehabilitation And Upgradation Of Nh 166A To Two Lane Paved Shoulder From Km 2.320 To Km 3.600 And Km 6.520 To Km 8.610 And From Km 14.070 To Km 14.470 Of Vadhkal Alibag Road Including Construction Of Major Bridge Flyover Vup For Design Length 3.77