#TBD : 35346432
26 Days Left
Road Transport
Goa
33.18 Crore
Due on : 13 Oct, 2025
Supply Installation Commissioning Maintenance Of Sensors Data Acquisition Data Transmission Analysis Management Reporting For The Same For Bhms For New Cable Stayed Zuari Bridge, Old Zuari Bridge On Nh-66 And Borim Bridge On Nh-566 In State Of Goa
#TBD : 35349101
40 Days Left
Road Transport
Goa
709.05 Crore
Due on : 27 Oct, 2025
Four Laning Of Boma To Old Goa Section Of Nh-748 From Km. 135.050 To Km. 142.050 In The State Of Goa.
#TBD : 35345780
27 Days Left
Health Services/equipments
Goa
9.00 Crore
Due on : 14 Oct, 2025
Supply Of Ayurvedic Medicines
#TBD : 35345148
2 Days Left
Water Supply And Drainage
Goa
10.13 Crore
Due on : 19 Sep, 2025
Rehabilitation Of N.m.e Pipe Sewers By Trenchless Techn. Using Inline Replace. Of Existing Sewers Of Vasco Sewerage System With Hdpe Pipe By Pipe Bursting Meth. In Vasco Rly St., Courtrd, Munc.rd, Flgomesrd, ...golden Hill Bldg And Surr...vasco Const.
#TBD : 35345816
5 Days Left
Tourism Services
Goa
3.13 Crore
Due on : 22 Sep, 2025
Upgradation Beautification And Illumination Of Shree Mahadev Devasthan Marad In Dharbandora Taluka
#TBD : 35345186
1 Days Left
Civil Work
Goa
Ref. Document
Due on : 18 Sep, 2025
Request For Proposal Rfp For Appointing Technical Support Unit Tsu For Swachha Bharat Mission Urban Sbm-u Including Development And Implementation Of Information, Education And Communication Iec Component Of Sbm U 2.0 Of Goa For A Period Of 1
#TBD : 35345674
12 Days Left
Industrial Development Agencies
Goa
93.19 Lacs
Due on : 29 Sep, 2025
Supply, Installation, Testing And Commissioning Of Water Pumps At Kundaim Industrial Estate
#TBD : 35345626
9 Days Left
Municipal Corporation
Goa
Ref. Document
Due on : 26 Sep, 2025
Design, Engineering, Financing, Construction, Supply, Installation, Commissioning, Performance Run And Operation And Maintenance For A Period Of Fifteen 15 Years Of 100 Tpd Capacity Solid Waste Processing Facility, At Bainguinim, Goa
#TBD : 35345373
12 Days Left
Shipping Transport
Goa
Ref. Document
Due on : 29 Sep, 2025
Desilting Work Of Mapusa River From Mapusa Highway Bridge At Tar To Downstream Upto Moira Within An Area Of 5.0 Kilometers In Length, 15.0 Metres Wide And 2.0 Metres Depth From Existing Depth, Including The Disposal Of The Desilted Materials Spoils
#TBD : 35345438
26 Days Left
Power Plant
Goa
12.61 Lacs
Due on : 13 Oct, 2025
The Work Of Earthing Health Assessment At 220/33/11kvamona Sub-station.