#TBD : 31663112
0 Days Left
Water Supply And Drainage
Jharkhand
4.38 Lacs
Due on : 29 Apr, 2024
Construction Of Toilet During Lok Sabha Election 2024 In Different Location For Capf And Sap Under D.W.And S. Div. Group No. Toilet 05
#TBD : 31663114
0 Days Left
Water Supply And Drainage
Jharkhand
6.97 Lacs
Due on : 29 Apr, 2024
Construction Of Toilet During Lok Sabha Election 2024 In Different Location For Capf And Sap Under D.W.And S. Div. Group No. Toilet 01
#TBD : 31653548
0 Days Left
Water Supply And Drainage
Jharkhand
1.89 Lacs
Due on : 26 Apr, 2024
Construction Of Bathroom Arrangement With Polythene Sheet Covering, Pvc Water Tank And Open Kacha Soakpit With Drain For Lok Sabha Election 2024 Under D.W. And S. Div. Group No. Bath 06
#TBD : 31653546
0 Days Left
Water Supply And Drainage
Jharkhand
1.42 Lacs
Due on : 26 Apr, 2024
Construction Of Bathroom Arrangement With Polythene Sheet Covering, Pvc Water Tank And Open Kacha Soakpit With Drain For Lok Sabha Election 2024 Under D.W. And S. Div. Group No. Bath 03
#TBD : 31653557
0 Days Left
Water Supply And Drainage
Jharkhand
1.89 Lacs
Due on : 26 Apr, 2024
Construction Of Bathroom Arrangement With Polythene Sheet Covering, Pvc Water Tank And Open Kacha Soakpit With Drain For Lok Sabha Election 2024 Under D.W. And S. Div. Group No. Bath 02
#TBD : 31653564
0 Days Left
Water Supply And Drainage
Jharkhand
4.26 Lacs
Due on : 26 Apr, 2024
Construction Of Bathroom Arrangement With Polythene Sheet Covering, Pvc Water Tank And Open Kacha Soakpit With Drain For Lok Sabha Election 2024 Under D.W. And S. Div. Group No. Bath 01
#TBD : 31653549
0 Days Left
Water Supply And Drainage
Jharkhand
3.31 Lacs
Due on : 26 Apr, 2024
Construction Of Bathroom Arrangement With Polythene Sheet Covering, Pvc Water Tank And Open Kacha Soakpit With Drain For Lok Sabha Election 2024 Under D.W. And S. Div. Group No. Bath 05
#TBD : 31653561
0 Days Left
Water Supply And Drainage
Jharkhand
2.36 Lacs
Due on : 26 Apr, 2024
Construction Of Bathroom Arrangement With Polythene Sheet Covering, Pvc Water Tank And Open Kacha Soakpit With Drain For Lok Sabha Election 2024 Under D.W. And S. Div. Group No. Bath 04
#TBD : 31630093
0 Days Left
Water Supply And Drainage
Jharkhand
4.18 Lacs
Due on : 19 Apr, 2024
Construction Of Toilet During Lok Sabha Election 2024 In Different Location For Capf And Sap Under D.W.And S. Group No. Toilet 03
#TBD : 31629869
0 Days Left
Water Supply And Drainage
Jharkhand
4.38 Lacs
Due on : 19 Apr, 2024
Construction Of Toilet During Lok Sabha Election 2024 In Different Location For Capf And Sap Under D.W.And S. Group No. Toilet 05