#TBD : 34390084
0 Days Left
Power Plant
Himachal Pradesh
12.74 Lacs
Due on : 30 Apr, 2025
Hiring Of 1 No. Truck Diesel Driven A/w Driver
#TBD : 34276981
0 Days Left
Power Plant
Himachal Pradesh
Ref. Document
Due on : 04 Apr, 2025
Dismantling / Replacement Of Old Existing Worn Out Parts And P/f Of New Rubber Seals Etc. Of Spillway Gate No.6
#TBD : 34277601
0 Days Left
Power Plant
Himachal Pradesh
Ref. Document
Due on : 04 Apr, 2025
Extraction Of 6 Nos. Stop Logs And Then Fixing Of Spared 6 Nos. Stop Logs Of Intake, Making Platform And Epoxy Painting Of Extracted Stop Logs Gates Of Intake Of Jateon Barrage O And M Of Barrage Gates
#TBD : 34277602
0 Days Left
Power Plant
Himachal Pradesh
Ref. Document
Due on : 04 Apr, 2025
Dismantling / Replacement Of Wornout Parts And P/f Of New M.s Seal Plate And S.s Seal Plate Of Spillway Gate No.6
#TBD : 34249776
0 Days Left
Road Transport
Himachal Pradesh
2.79 Crore
Due on : 19 Apr, 2025
Special Repairs At Vulnerable Locations On Nh-907a In The State Of Himachal Pradesh Annual Plan 2024-25 Special Repairs At Vulnerable Locations On Nh-907a
#TBD : 34209380
0 Days Left
Construction
Himachal Pradesh
Ref. Document
Due on : 22 Mar, 2025
Missing Cd On Sarahan Chandigarh Road Km 0/0 To 42/00 Sh- P/L Slab On Existing Abutment Rd 40/315 C/O Wing Walls Etc
#TBD : 34204188
0 Days Left
Construction
Himachal Pradesh
7.28 Lacs
Due on : 25 Mar, 2025
Link Road From Bhawai To Jiyad Via Jogi Bag Gp Bhawai Km. 0/00 To 13/00 Sh C/O 900 Mm Dia Hume Pipe Culvert
#TBD : 34204277
0 Days Left
Construction
Himachal Pradesh
4.11 Crore
Due on : 22 Mar, 2025
Construction Of Type-Iii Quarter 1 No And Type-Ii Quarter 12 Nos For Police Station Sadar
#TBD : 34207032
0 Days Left
Construction
Himachal Pradesh
14.47 Lacs
Due on : 25 Mar, 2025
Repair Of Pot Holes And Bituminous Concrete 25 Mm Thick Using Plastic Based From Km. 2/00 To 3/130 1.130
#TBD : 34186123
0 Days Left
Warehousing And Storage
Himachal Pradesh
15.26 Lacs
Due on : 27 Mar, 2025
Door Step Delivery Of Foodgrains From Hpscsc To Fps