#TBD : 31555532
0 Days Left
Power
Andhra Pradesh
6.03 Lacs
Due on : 30 Mar, 2024
Replacement Of Damaged M.S Pipes Of Various Sizes At Various Locations Of Hydrant, Raw Water, Clarified, Lp & Hp Water Lines And Air Lines Of Unit-I And Ii, Replacement Of G.I Pipes Of Various Sizes Of Drinking Water Lines From D.M.Plant To Service Building And C.H.P.Area And Rectification Of Hydrant Landing Valves, Water Monitors, Emulsifier Deluge Valves At Stage-I, Chp I & Ii, Cleaning Of Sprinkler Nozzles At Fuel Oil Pump House, Painting Of Emulsifier System At Transformer Yard Of Unit-I & Ii During The Year 2024-25.
#TBD : 31547968
0 Days Left
Power
Andhra Pradesh
5.58 Lacs
Due on : 28 Mar, 2024
Replacement, Overhaul And Providing Sleeves To The End Shield Covers Of Lt Motors At Turbine, Boiler And Common Auxiliaries Areas Of Stage-I As And When Required During The Year 2024-25
#TBD : 31547980
0 Days Left
Power
Andhra Pradesh
6.60 Lacs
Due on : 28 Mar, 2024
Dr.Nttps/Stge-I. Repair, Reconditioning & Ceramic Tiles Replacement Of Damaged Pf Bends Of Bowl Mills Of Unit- I & Ii, Stage-I, Drnttps For The Year 2024-25.
#TBD : 31547969
0 Days Left
Power
Andhra Pradesh
5.15 Lacs
Due on : 28 Mar, 2024
Annual Overhaul Of Turbo Generator-1 & 2 For The Year 2024-2025
#TBD : 31547970
0 Days Left
Power
Andhra Pradesh
11.73 Lacs
Due on : 28 Mar, 2024
Emergency Replacement, Rectification And Fabrication Of Ms Bends Ms/Ci Pipes & Tyton/Sleeve Gaskets Of Three Ash Disposal Lines Of Stage-I During The Year 2024-25.
#TBD : 31534363
0 Days Left
Power
Andhra Pradesh
8.25 Lacs
Due on : 27 Mar, 2024
Removing Of Boulders & Foreign Materials From Raw Coal Feeders, Clearing Of Foreign Materials From Bowl Mills And Scraper Chamber Of Mills And Related Works At Boiler Area Of Unit-I & Ii As And When Required For The Period From 01.04.2024 To 31.03.2025
#TBD : 31534368
0 Days Left
Power
Andhra Pradesh
36.57 Lacs
Due on : 27 Mar, 2024
Complete Overhauling Of Bowl Mill, Blue Matching Works, Replacement Of Air Regulatory Assembly And Servicing Of Gear Boxes Of Rc Feeders, Servicing Of Gear Box And Replacement Of Mill Side Liners And Insulation Cover Plate Assembly, Replacement Of Grinding Elements, Servicing Of Roller Journal Assembly, Adjustment Of Grinding Rolls And Preventive Maintenance Of Bowl Mills, Etc Of Units- I & Ii/ Stage.I/Dr.Nttps For The Year 2024-25.
#TBD : 31534357
0 Days Left
Power
Andhra Pradesh
10.71 Lacs
Due on : 27 Mar, 2024
Labour Charges For Loading And Unloading Of Hydrogen Gas Cylinders At Stg.I, Ii & Iii Locations, H2 Gas Go-Down Of Stg.I And Hydrogen Gas Plant/Stg.Iv/Dr Nttps For The Period From 01-04-2024 To 31-03-2025..
#TBD : 31534365
0 Days Left
Power
Andhra Pradesh
5.84 Lacs
Due on : 27 Mar, 2024
Labour Charges Towards Poking Of Bunkers Of Stg.I From R.C. Feeders Floor For Establishing Coal Flow To The Mills While Mills Are In Service And Any Other Related Work For The Period From 01-04-2024 To 31-03-2025
#TBD : 31442750
0 Days Left
Power
Andhra Pradesh
5.61 Lacs
Due on : 19 Mar, 2024
Dr.Nttps-Maintenance Of Plants At Stage-I, Ii, Iii Cw Pump Hpouses And Cooling Towers, Removal Of Floating Debris At Stage-I Intake Structure, Stage-I, Ii, Iii Cwph For The Year 2024-25