#TBD : 31673705
28 Days Left
Civil Work
Uttar Pradesh
Ref. Document
Due on : 27 May, 2024
Development Work Of Tourism Place Of Baba Karsulnath Dham, Kandhi Maharajganj
#TBD : 31668932
1 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 30 Apr, 2024
Supply Of Various Material - Winding temperature indicator, oil temperature indicator, vaccum interruptor suitable for panel, etc For Strenthening And Testing Of 33 Kv And 11 Kv Protection System Installed At 33 11 Kv Substation Under B.P 2024-25 Under The Area Of Edd Ii Shahganj Machhalishahar
#TBD : 31668519
0 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 29 Apr, 2024
Construction Of Work Of Tailless Unit On L.T Of 250 Kva 400Kva 630Kva T/F Under B.P Plan 2024-25 Under Area Edd Ii Shahganj Machhalishahar
#TBD : 31668475
1 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 30 Apr, 2024
Work Of Replacing The Damage 33 Kv Vcb And Control Pannal Installed At 33 11 Kv Substation Under B.P 2024-25 Under Edd Ii Shahganj Machhalishahar
#TBD : 31662376
0 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 29 Apr, 2024
Construction Of Line To Provide Electricity Connection To Primari And Higher Secondry School Under Government Deposite Scheme Under Edd Machhalishshar
#TBD : 31668632
0 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 29 Apr, 2024
Supply Of Tailless Units To Prevent Damage To 250 Kva 400 Kva 630 Kva T/F At Various Places Under B.P 2024-25 Under Edd Ii Shahganj Machhalishahar
#TBD : 31668743
1 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 30 Apr, 2024
Work Of Overhauling Of Damaged 33 Kv Vcb And Cantrol Pannal Installed At 33 11 Kv Substation Under The B.P 2024-25 Under The Area Of Edd-Ii Machhalishahar
#TBD : 31668882
1 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 30 Apr, 2024
Work Of Increasing The Capacity Of 10 To 25 Kva Tf 02 No And 100 To 250 Kva Tf 02 No And Regrouping And Electrification At Various Place Under B.P Plan 2024-25 Under Edd Machhalishahar
#TBD : 31668841
1 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 30 Apr, 2024
Work Of Over Haulling Of Damaged 11 Kv Vcb Swichgear Installed At 33 11 Kv Substation Under B.P 2024-25 Under Area Of Edd Ii Machhalishahar
#TBD : 31668634
1 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 30 Apr, 2024
Work Of Replacement Of Damaged 33 Kv Cable In 33 11 Kv Substation And Damaged Undergrounding Cable Of Railway Crossing And Noc By Railway Under B.P Plan 2024-25 Under Edd Ii Shahganj Machhalishahar