#TBD : 31664224
18 Days Left
Railway Transport
Tripura
Ref. Document
Due on : 23 May, 2024
Supply of Wider Curve Slack Gauge Sleeper 1675 Mm Drg. No. T-8979 Warranty Period: 30 Months After The Date Of Delivery Wider Curve Slack Gauge Sleeper 1682 Mm Drg. No. T-8982 Warranty Period: 30 Months After The Date Of Delivery Wider Curve Slack Gauge Sleeper 1679 Mm Drg. No. T-8981 Warranty Period: 30 Months After The Date Of Delivery Wider Curve Slack Gauge Sleeper 1677 Mm Drg. No.T-8980 Warranty Period: 30 Months After The Date Of Delivery
#TBD : 31627756
0 Days Left
Security Services
Tripura
Ref. Document
Due on : 04 May, 2024
Supply of Wall Speaker Amplifier Speaker wire Extension Board Pen Drive
#TBD : 31518715
0 Days Left
Construction
Tripura
5.60 Crore
Due on : 03 Apr, 2024
Building Portion Including Internal Water Supply, Sanitary Installation, Sewage And Drainage Works, Etc. Infrastructure Development Of Bakbaki High School Kadamtala, Dharmanagar, North Tripura Sanctioned Under Ridf-Xxix
#TBD : 31508893
0 Days Left
Construction
Tripura
8.75 Lacs
Due on : 04 Apr, 2024
Construction Of Mark-Ii Tube Well At Different Location Within The Juridiction Of Kadamtala And Kalacherra Under Dws Sub-Division, Dharmanagar 2023-24 Deposite
#TBD : 31508563
0 Days Left
Construction
Tripura
17.47 Lacs
Due on : 04 Apr, 2024
Uws Scheme Under North Tripura District During The Year 2023-24/ Sh- Extension Of Di Pipeline And Providing Domection Connection
#TBD : 31508928
0 Days Left
Construction
Tripura
9.01 Lacs
Due on : 04 Apr, 2024
Pdf/ Ffc/ Beup/ Other Panchayet Fund Construction Of Rcc Well 1.20M Dia At Different Location Within The Juridiction Of Kadamtala And Kalacherra Under Dws Sub-Division, /2023-24 Deposite
#TBD : 31499291
0 Days Left
Animal And Animal Feeds
Tripura
8.00 Lacs
Due on : 28 Mar, 2024
Supply Of 10 Cm Above Major Carp Fingerlings To The Different Gram Panchayet/Village Council, Municipal Council Etc. Of Dharmanagar Sub Division, North, Tripura For Implementation Of Different Pisciculture Schemes
#TBD : 31499237
0 Days Left
Construction
Tripura
9.78 Lacs
Due on : 03 Apr, 2024
Uws Scheme Of Dws Division Dharmanagar/Providing Installation, Commissioning Of 1No. 75000 Gph Capacity, 30 M Head Raw Water Horizontal Split Casing Centrifugal Pumpset With 60 H.P. Horizontal Motor For Wtp At Dharmanagar 2023-24
#TBD : 31499267
0 Days Left
Construction
Tripura
29.33 Lacs
Due on : 22 Mar, 2024
Flood Protection Anti Erosion Works Along The Bank Of River Juri For Protection Of Vulnerable Locations Near The Land Of Sitesth Nath At Ward No.5 Radhapur Gp Under Jubarajnagar Block Sh Anti Erosion Works By Sand Cement Block Of 1 8 1 Cement
#TBD : 31499668
0 Days Left
Construction
Tripura
4.83 Lacs
Due on : 03 Apr, 2024
Rws/Nrdwp Scheme Of Dws Division Dharmanagar/Providing Installation, Commissioning Of 1No. 70Mmm/H Gph Capacity, 50M Head Raw Water Horizontal Split Casing Centrifugal Pumpset With 20 H.P. Horizontal Motor For Innovative Wtp At Churaibari 2023 -24