#TBD : 31696999
7 Days Left
Power Plant
Jharkhand
Ref. Document
Due on : 13 May, 2024
Supply of 270 Sch1 100237291 M2441240951 Electrode Wldg Er80s-B2 2.4Mm Tgs-1Cm North Karanpura Super Thermal Q3 Sch2 100237291 M2441260968 Electrode Wldg As Er90s-B3 2.4Mm 1000Mm North Karanpura Super Thermal Q3 Sch3 100237291 M2441280957 Electrode Wldg Er347 2.4Mm 1000Mm Fw 347 North Karanpura Super Thermal Q3 Sch4 100237291 M2441300952 Electrode Wldg Er90s-B9 2.4Mm 1000Mm North Karanpura Super Thermal Q3
#TBD : 31701480
12 Days Left
Coal And Lignite
Jharkhand
121.86 Crore
Due on : 18 May, 2024
Handling Transport And Other Mining Services - Percentage Quote Based - Handling & Transport Service Loading Of Coal From Different Surface Coal Stock Yards Of Magadh Ocp And Transportation Of The Same Through Tippers From Magadh Coal Stock Yards T..
#TBD : 31688115
15 Days Left
Coal And Lignite
Jharkhand
Ref. Document
Due on : 21 May, 2024
Supply of 4 Power Supply Modules For Telemecanique Plc System. Q3
#TBD : 31695704
7 Days Left
Coal And Lignite
Jharkhand
34.68 Lacs
Due on : 13 May, 2024
Providing And Laying Of Hume At Weigh
Bridges And Roads In Amrapali Mine
Under Amrapali Ocp A-C Area, Ccl
#TBD : 31695806
5 Days Left
Coal And Lignite
Jharkhand
3.79 Lacs
Due on : 11 May, 2024
Power Arrangement And Ups Backup Power Arrangement Under Cctv Surveillance For Installation Of Biometric Attendance Machine In Various Places Of Magadh Ocp Electrical Work Of Installation And Commissioning Of Biometric System At Magadh Ocp
#TBD : 31696449
7 Days Left
Electrical Products
Jharkhand
Ref. Document
Due on : 13 May, 2024
Supply of 30 High Strength Deformed Steel Bars And Wires For Concrete Reinforcement - As Per Is 1786 Latest Q2
#TBD : 31689291
9 Days Left
Coal And Lignite
Jharkhand
96.59 Crore
Due on : 15 May, 2024
Handling Transport And Other Mining Services - Percentage Quote Based - Handling & Transport Service Loading And Transportation Of 84 Lakh Te Coal From Chp Cpp Piparwar Loading Point To Bachra Spur Siding Piparwar Area For The Period Of 2 Years
#TBD : 31688329
5 Days Left
Coal And Lignite
Jharkhand
4.75 Lacs
Due on : 11 May, 2024
Repairing And Reconditioning/ Overhauling On Site Of Two No Pumps 1000Gpm, 120M Head And 1000Gpm, 150Mtr Head Make Kirloskar Model No Mla200/225 Pump Under Ashok Ocp, Pr Area
#TBD : 31688367
3 Days Left
Coal And Lignite
Jharkhand
2.22 Lacs
Due on : 09 May, 2024
Repairing Of Recoil Spring Assembly, Track Chain Link And Fabrication Of 02 Nos. Tunioin Cover, Track Roller Guard, Track Frame Cover, Engine Guard Of Dozer D155, Sl No-13635 Of Magadh Ocp, Magadh-Sanghmitra Area
#TBD : 31692144
7 Days Left
Power Plant
Jharkhand
4.42 Crore
Due on : 13 May, 2024
Custom Bid For Services - 200131861 Biennial Contract Of Oh Of Boiler Pp Burners Valves For U12 Of Nkstpp 3660Mw Supercritical Boilers