#TBD : 34188342
0 Days Left
Construction
Himachal Pradesh
28.67 Lacs
Due on : 17 Mar, 2025
Sh Improvement Of Chowk At Jahu Junction Bam Jahu Road On Uam Road Byepass Jahu At Rd 90 270 To 90 340 C O R Wall At Rd 90 278 To 90 328 R S 90 335 To 90 555 R S 90 272 To 90 287 Ls P L Gsb Wmm Bm Bc Etc At Various Rds Junction Chowk
#TBD : 34189835
0 Days Left
Construction
Himachal Pradesh
8.56 Lacs
Due on : 18 Mar, 2025
Board Shelves Painting Work Providing And Fixing Window Shutter And Sanitary Work Repair Of Rest Houde At Sarkaghat
#TBD : 34064789
0 Days Left
Coal And Lignite
Himachal Pradesh
Ref. Document
Due on : 05 Mar, 2025
Diversion Of 440V And 550V Overhead Line From A Madhuban New Pit To Madhuban, B Madhuban Rescue Office And C Dhobatand Basti Under Phularitand Amp Colliery.
#TBD : 34064241
0 Days Left
Road Work
Himachal Pradesh
23.25 Crore
Due on : 22 Mar, 2025
Providing Wmm 75 Mm Thick Two Layers 60 Mm Thick Dbm And Applying Prime Coat And Tack Coat And Laying 40 Mm Thick Bc And Applying 2.50 Mm Thick Thermoplastic Paint And Road Stud 100X100 Mm Bet Km 78.700 To Km 95.00 On Nimmu-Padam-Darcha Road Under
#TBD : 33995280
0 Days Left
Coal And Lignite
Himachal Pradesh
Ref. Document
Due on : 25 Feb, 2025
Adiversion Of Existing 10Inch Dia Piperange From Jharna Sump And Laying Through A Separate Route Due To Widening Of Ob Dump Brepairing Of 10Inch Dia Piperange From Jharna Sump To Muraidih Filter Plant Under Muraidih, Amp Colliery, Barora Area.
#TBD : 33995312
0 Days Left
Coal And Lignite
Himachal Pradesh
Ref. Document
Due on : 24 Feb, 2025
Repairing Of Receiving Chute Of Hopper Along With Supporting Materials Of Feeder Breaker No-2, Phularitand Colliery.
#TBD : 33951785
0 Days Left
Education And Research Institutes
Himachal Pradesh
12.40 Lacs
Due on : 24 Feb, 2025
525-Construction Of One Class Room Work At Gups Nathadand Block - Jahajpur Gram Panchayat
#TBD : 33954908
0 Days Left
Coal And Lignite
Himachal Pradesh
Ref. Document
Due on : 18 Feb, 2025
Dismantling And Diversion Of 3.3 Kv Overhead Line From 1K Pit Substation Of Main Patch Jarlahi Pump Face Of Phularitand, Ampc Under Barora Area.
#TBD : 33954391
0 Days Left
Coal And Lignite
Himachal Pradesh
Ref. Document
Due on : 19 Feb, 2025
Dismantling And Diversion Of 3.3Kv O/H Line For Providing Power To 2000Gpm Pump And Dismantling And Diversion Of 220V O/H Line For Provide Lighting In Pumping Place Of Mine At Old Ghutway Patch 3A.
#TBD : 33954411
0 Days Left
Coal And Lignite
Himachal Pradesh
Ref. Document
Due on : 18 Feb, 2025
Repairing And Re-Tensioning Of Damaged And Sagged Conductor Of 440V O/H Line For Feed Power To Sijua Basti And Other Domestic Place For Safety Reasons At Damoda Colliery.