#TBD : 31616445
3 Days Left
Road Work
Arunachal Pradesh
24.87 Lacs
Due on : 24 Apr, 2024
Supply And Stacking Of Material For Construction Of Accommodation At Various Locations In Pine Grove At Hq 756 Brtf Gref Project Arunank
#TBD : 31587356
9 Days Left
Road Work
Arunachal Pradesh
Ref. Document
Due on : 30 Apr, 2024
Supply And Stacking Crushed Stone Chips 22.4 Mm, Stone Chips 11.20 Mm, Stone Chips 6.7 Mm And Stone Dust At Km 106.00 Hmp Site On Balipara Charduar Tawang Road For Resurf Works 2024-25 On Bct And Oksrt Road In State Of Arunachal Pradesh Resurfacing Works 2024-25
#TBD : 31395505
0 Days Left
Road Work
Arunachal Pradesh
80.71 Lacs
Due on : 16 Mar, 2024
Preparation Of Detailed Project Report Dpr For Construction Of Road Tawang- Womingla- Kumrotsar From Km 0.000 To Km 40.000 To Nhsl Specification In Sector Of 120 Rcc/ 763 Brtf/ Project
#TBD : 30049467
0 Days Left
Construction
Arunachal Pradesh
20.00 Lacs
Due on : 21 Nov, 2023
Special Repair Of Canal Track From Sarayatki To Railway Line
#TBD : 29253305
0 Days Left
Road Work
Arunachal Pradesh
2.31 Crore
Due on : 09 Sep, 2023
Providing And Laying Of 30 Mm Thick Bc Compacted And Correction Work For Resurfacing Works On Road Khirmu Geshela Bet Km 33.661 To 40.730 And Road Ptso Geshela Bet Km 7.142 To 9.150 Under Aor Of 763 Brtf In Project
#TBD : 28546673
0 Days Left
Road Work
Arunachal Pradesh
2.31 Crore
Due on : 17 Jul, 2023
Providing And Laying Of 30 Mm Thick Bc And 50 Mm Thick Bm For Resurfacing Works On Road Khirmu Geshela Bet Km 33.661 To 40.730 And Road Ptso Geshela Bet Km 7.142 To 9.150 Under Aor Of 763 Brtf
#TBD : 27768182
0 Days Left
Road Work
Arunachal Pradesh
23.5 Thousand
Due on : 24 Apr, 2023
Ashok Leyland Tipper Ba No 14E 72376 Of
125 Rcc
#TBD : 27613714
0 Days Left
Road Work
Arunachal Pradesh
21.49 Crore
Due on : 20 Apr, 2023
Providing And Laying Of Wbm 100 Mm, Wbm-75 Mm In Two Layers, Laying Of Ilcb 80Mm Thick M-50, Laying Of Sand Blanket 30 Mm Thick For Conc Pavement Works On Rd Assam Hill - Lgg From Km 0.00 To Km 10.700 Under 763 Brtf,
#TBD : 27612482
0 Days Left
Road Work
Arunachal Pradesh
21.49 Crore
Due on : 20 Apr, 2023
Providing And Laying Of Wbm 100 Mm, Wbm-75 Mm In Two Layers, Laying Of Ilcb 80Mm Thick M-50, Laying Of Sand Blanket 30 Mm Thick For Conc Pavement Works On Rd Assam Hill - Lgg From Km 0.00 To Km 10.700
#TBD : 27457111
0 Days Left
Road Work
Arunachal Pradesh
11.76 Crore
Due on : 01 Apr, 2023
Supply And Stacking Of S/ Metal Of Size 45 Mm, S/Metal 40 Mm, S/ Chips 20 Mm, S/ Chips 10 Mm And Coarse Sand For Pmt Work In Bet Km 0.910 To Km 12.000 In Various Stretch On Nelya- Dhaula Rd Under 127 Rcc/ 42 Brtf/ Project