#TBD : 31558759
2 Days Left
Panchayat Division
Karnataka
19.04 Lacs
Due on : 01 Apr, 2024
Manpower Of Drivers, Helpers, Watchmen For Swm Site
#TBD : 31424859
0 Days Left
Panchayat Division
Karnataka
1.98 Lacs
Due on : 18 Mar, 2024
Animal Birth Controle Surgery At Tp Limits
#TBD : 31558756
2 Days Left
Panchayat Division
Karnataka
4.20 Lacs
Due on : 01 Apr, 2024
Hiring Non Ac Vehicle For Office
#TBD : 31424843
0 Days Left
Panchayat Division
Karnataka
1.59 Lacs
Due on : 18 Mar, 2024
Providing And Supply Of Drinking Water To Draught Affected Areas Under Wards Of Tp Limits Through Water Tankers.
#TBD : 31533479
0 Days Left
Enviromental/forest Division
Karnataka
7.44 Lacs
Due on : 26 Mar, 2024
Raising Of 2024 Rains Manichenduru To Yadiyuru-Gubbi Main Road Via Hanumapura Roadside Spill Over Plantation In Sf Range During 2024-25-3.0Km-For Sc
#TBD : 31473036
0 Days Left
Canal/irrigation/dam Work
Karnataka
1.26 Crore
Due on : 18 Mar, 2024
Improvements To Road From Beerasandra Palya To Dandinashivara-Banasandra Road In Kibbanahalli Hobli Of Tiptur Taluk Coming Under The Atchkat Of D-9 Of Tbc.
#TBD : 31422877
0 Days Left
Panchayat Division
Karnataka
5.00 Lacs
Due on : 18 Mar, 2024
Providing And Supply Pump Motar, Pipes, Sluice Valves To Water Treatment Plant
#TBD : 31422906
0 Days Left
Panchayat Division
Karnataka
2.50 Lacs
Due on : 18 Mar, 2024
Digging Of Borewell At Ward No 10 Revanna Siddeshwara Temple Beside Limits.
#TBD : 31422925
0 Days Left
Panchayat Division
Karnataka
60.0 Thousand
Due on : 18 Mar, 2024
Providing And Construction Of New Water Line And Other Required Facilities To Anganavadi
#TBD : 31536972
19 Days Left
Construction
Karnataka
Ref. Document
Due on : 18 Apr, 2024
Improvements To Road From Kengal On Nh275 To Alur On Sh110l Via Kanva, Huliyurdurga, Yadiyur Nh 75 Mayasandra, Turvekere, Soravanahalli, Nh 150A Bochihalli, Talkere, Aralikere Palya, Vishwanathpur Nh 150A, Edigarahatti, Doddakanagal Road Sh-275 From Ch 91.00 Km To 97.90 Km In Selected Reahes