#TBD : 31552113
0 Days Left
Municipal Corporation
Karnataka
8.41 Lacs
Due on : 01 Apr, 2024
Providing And Laying Of Drinking Water 4 Inch Hdpe Pipe Line In Ward No. 30
#TBD : 31552137
0 Days Left
Municipal Corporation
Karnataka
28.50 Lacs
Due on : 01 Apr, 2024
Providing And Fixing Of Electrical Pole And Extension Of Lt Line And Street Light And Fixing Of Tc In Ward No 03, 06, 08, 14, 15, 19, 23, 28, 30
#TBD : 31552121
0 Days Left
Municipal Corporation
Karnataka
1.26 Lacs
Due on : 01 Apr, 2024
Development Of Toilet In Ward No. 01 Near Public Samudaya Bhavan Limit
#TBD : 31552128
0 Days Left
Municipal Corporation
Karnataka
14.72 Lacs
Due on : 01 Apr, 2024
Providing And Laying Of Drinking Water 6 And 4 Inch Hdpe Pipe Line From Ward No. 31 Near Mantesari School Oht To Ward No. 30 Venkateshwara Nagar
#TBD : 31537174
0 Days Left
Construction
Karnataka
Ref. Document
Due on : 18 Apr, 2024
Improvements To Road Connecting From Sh-13 To Venkateshwara Camp Via Gandhinagar, Satyavati Camp, Mudalagiri Camp And Gorebal Camp From Ch- 0.00 Km To 12.00 Km Mdrin Selected Reaches
#TBD : 31532047
0 Days Left
Municipal Corporation
Karnataka
Ref. Document
Due on : 30 Mar, 2024
Technical Consultancy Services For Conducting Survey, Analysis, Geo-Technical Investigation, Testing, Design, Drawing And Preparation Of Dpr 120 Acre For Construction Of Lower Impounding Reservoir At Turvihal Village, Sindhanur Taluk, Raichur District For Supplying Drinking Water
#TBD : 31453381
0 Days Left
Municipal Corporation
Karnataka
Ref. Document
Due on : 21 Mar, 2024
Purchase Of One Number Of Tractor And Two Number Of Tractor Trailer For Solid Waste Disposal In Cmc
#TBD : 31038568
0 Days Left
Civil Work
Karnataka
6.79 Lacs
Due on : 19 Feb, 2024
Supply Of Materials For The Construction Of Metal Roadfrom Prakash Land To Ramesh Krishna Reddy Land At Raithangar Camp Under Mgnregs Scheme
#TBD : 31039348
0 Days Left
Agricultural And Floriculture And Silviculture Products
Karnataka
Ref. Document
Due on : 17 Feb, 2024
Providing Yard Cleaning Service
#TBD : 31039153
0 Days Left
Civil Work
Karnataka
6.78 Lacs
Due on : 19 Feb, 2024
Construction Of Cc Raod From Main Raod To Gp At Pagadadinni Village