#TBD : 34234191
13 Days Left
Scientific Research And Instruments
Jharkhand
45.84 Lacs
Due on : 09 Apr, 2025
Minor Civil And Electric Works Conservation Of Ancient Monuments To Gabion Wire Mesh Filled With Rubble Stone To Protect Erosion Of Submerged Portion The Ruins Of Baradari Buildings Foundation
#TBD : 34197191
0 Days Left
Panchayat Division
Jharkhand
5.13 Lacs
Due on : 20 Mar, 2025
Construction Of Toilet At Sanjori Sidho Kanhu Middle School In Hiranpur Gp And Const. Of Siri Ghat At Panchakatiya Bazar In The Pond Of Nunka Soren Gp Panchakathiya Bazar, Block - Barhait, Dist - Sbg
#TBD : 34164195
0 Days Left
Road Work
Jharkhand
Ref. Document
Due on : 24 Mar, 2025
Consultancy Services For Preparation Of Detailed Project Report For Construction Of Ring Road From Modikola Mdr-211 To Dulampur Nh-133A
#TBD : 34133050
0 Days Left
Civil Work
Jharkhand
3.12 Crore
Due on : 15 Mar, 2025
Construction Of Road From R.E.O. Road Rakshi To Dumariya Chowk Via Birajpur L-3.361Km.
#TBD : 34133065
0 Days Left
Services
Jharkhand
29.55 Lacs
Due on : 10 Mar, 2025
Const. Of Solor Pump Based High Yielding Drilled Tube Well Hydt Water Suplly Scheme In Awc At Borio Block 1 Panchayat - Durga Tola Village Simaljori 2 Panchayat - Bishanpur Village Murgabvani 3 Panchayat And Village Poaal 4 Panchayat - Moti
#TBD : 34039688
0 Days Left
Services
Jharkhand
98.61 Lacs
Due on : 01 Mar, 2025
Construction Of Library At Sahibganj, Dist-Sahibganj, Jharkhand, For The Year 2024-2025
#TBD : 34042465
0 Days Left
Building Work
Jharkhand
73.71 Lacs
Due on : 26 Feb, 2025
Detailed Design, Engineering, Supply, Installation, Testing And Commissioning Of Rack And Pinion Type Stack Elevator For 2 Nos. Of 150 Meter High Reinforced Concrete Single Steel Flue Chimney Unit 1 2 Of Fgd System At 3 660 Mw No Detailed Design Engineering Supply, Installation, Testing And Commissioning Of Rack And Pinion Type Stack Elevator For 2 Nos. Of 150 Meter High Reinforced Concrete Single Steel Flue Chimney Unit 1 2 Of Fgd System At 3 660 Mw North Karanpura
#TBD : 34026922
0 Days Left
Water Supply And Drainage
Jharkhand
24.66 Lacs
Due on : 27 Feb, 2025
Construction Of Solar Motor Pump Based Mini Water Supply Scheme In Pvtg Village Pvtg-79
#TBD : 33996555
0 Days Left
Construction
Jharkhand
6.97 Lacs
Due on : 25 Feb, 2025
Renovation Work Of Community Health Centre Taljhari, Block-Taljhari, Dist-Sahibganj.
#TBD : 33975764
0 Days Left
Construction
Jharkhand
6.77 Lacs
Due on : 20 Feb, 2025
Repair Of Barharwa Chc, Under Barharwa Block