#TBD : 31505924
8 Days Left
Road Work
Arunachal Pradesh
11.10 Lacs
Due on : 06 Apr, 2024
Hiring Of 01 Nos Mahindra Scorpio Diesel 4X2 And 01 Nos Mahindra Bolero Diesel 4X2 Along With Driver Without Pol For Conveyance Of Troops To Various Locations Under Aor Of Hq 752 Brtf Project Udayak In Arunachal Pradesh State For Financial Year 2024- Hiring Of Light Vehicles
#TBD : 31411371
0 Days Left
Road Work
Arunachal Pradesh
52.77 Lacs
Due on : 25 Mar, 2024
Handling And Or Conveyance Of Stores From Dett 534 Sstc Doomdooma Assam To Various Road Sectors Of 103 Rcc Under 752 Brtf Project Udayak In Arunachal Pradesh State Handling And Conveyance
#TBD : 31289975
0 Days Left
Construction
Arunachal Pradesh
Ref. Document
Due on : 07 Mar, 2024
Up-Gradation Of Building Of Fire Station At Roing
#TBD : 31220926
0 Days Left
Road Work
Arunachal Pradesh
2.92 Crore
Due on : 11 Mar, 2024
Construction Of road Fc, Gsb, Wbm, Cds, R/B Walls,
Prime Coat, Track Coat, Cc Drain, Road Furniture Etc Road From Nh-313 To Yuma
#TBD : 31220805
0 Days Left
Road Work
Arunachal Pradesh
10.53 Crore
Due on : 11 Mar, 2024
Construction Of road Fc, Gsb, Wbm, Cds, R/B Walls,
Prime Coat, Track Coat, Cc Drain, Road Furniture Etc Road From Desali Hq To Chanli.
#TBD : 31101948
0 Days Left
Road Work
Arunachal Pradesh
52.77 Lacs
Due on : 07 Mar, 2024
Handling And Or Conveyance Of Stores From Dett 534 Sstc Doomdooma Assam To Various Road Sectors Of 103 Rcc Under 752 Brtf Project Udayak In Arunachal Pradesh State. Handling And Conveyance
#TBD : 31076676
0 Days Left
Road Work
Arunachal Pradesh
14.58 Lacs
Due on : 06 Mar, 2024
Supply And Stacking Of Stone Chips 13.20 Mm, Stone Chips 11.20 Mm, Stone Chips 6.70 Mm And Sand For Bituminous Concrete 3.00 Cm Thick As Per Morth Specifications At Km 0.200 Hmp Location On Tissa-Wakka Road Under 103 Rcc Of 752 Brtf Under Project Supply And Stacking
#TBD : 31033286
0 Days Left
Road Work
Arunachal Pradesh
8.82 Crore
Due on : 05 Mar, 2024
Providing, Laying And Compaction Of 40 Mm Thick Bc, 30 Mm Thick Bc, Bm 50 Mm Thick And Applying Tack Coat As Per Morth Specifications Complete In All Respect For Resurf Wks 2024-25 At Various Loc Of Road Meka Roing Hunli And Internal Roads Of 752 Tf
#TBD : 30889275
0 Days Left
Civil Work
Arunachal Pradesh
2.97 Crore
Due on : 21 Feb, 2024
Annual Repair And Maintenance Of Construction Of Two Laning Of Existing Hunli-Anini Road On Epc Basis From Design Km 37.500 To Km 53.500 In State Of Arunachal Pradesh Maintenance And Repair Of Hunli-Anini Pkg-Ii
#TBD : 30840773
0 Days Left
Construction
Arunachal Pradesh
Ref. Document
Due on : 05 Feb, 2024
Construction Of New Fire Station At Dambuk, Lower Dibang Valley District