#TBD : 31647869
8 Days Left
Water Supply And Drainage
Jammu And Kashmir
14.99 Lacs
Due on : 29 Apr, 2024
Drilling Of 125Mm Dia Tube Wells For Security Establishments Inside Migrant Colony Vessu As An Alternate Arrangements Including Harnessing Arrangements All Complete Phe Division Qazigund Under Sanjay 2024-25
#TBD : 31647891
8 Days Left
Water Supply And Drainage
Jammu And Kashmir
3.92 Lacs
Due on : 29 Apr, 2024
Providing Water Supply Facilities To Shri Amarnath Ji Yatries At Base Camp Walnut Factory Levdoora Qazigund During Yatra Under Sanjay 2024-25
#TBD : 31637296
8 Days Left
Power Plant
Jammu And Kashmir
2.60 Lacs
Due on : 29 Apr, 2024
Improvement Of Lt Network At Yatra Base Camp At Mirbazar For Sanjay - 2024 By Way Of Laying Of L T Network In Fci Godown Area And Stablization Of L T Network On The Bank Of Nh 44 To Facilitiate Safe Parking Space And Illumination.
#TBD : 31647883
8 Days Left
Water Supply And Drainage
Jammu And Kashmir
7.91 Lacs
Due on : 29 Apr, 2024
Providing Water Supply Facilities To Shri Amarnath Ji Yatries At Base Camp Fci Godown Mirbazar During The Year 2024 Sanjay 2024-25
#TBD : 31641318
8 Days Left
Power Plant
Jammu And Kashmir
13.10 Lacs
Due on : 29 Apr, 2024
Arrangement For Illumination And Providing Of Un-Interrupted Power Supply To Transit Base Camp At Fci Godown Mirbazaar And Transit Base Camp At Walnut Factory Qazigund By Way Operation And Maintenance Of Dg Sets, Led Lights Etc For Sanjy-2024.
#TBD : 31637298
8 Days Left
Power Plant
Jammu And Kashmir
8.20 Lacs
Due on : 29 Apr, 2024
Arrangement For Illumination And Providing Of Un-Interrupted Power Supply To Transit Base Camp At Fci Godown Mirbazaar And Transit Base Camp At Walnut Factory Qazigund By Way Of Sitc Of 12.5Mtr Highmast Lights For Sanjy-2024.
#TBD : 31640983
6 Days Left
Crude Oil/natural Gas/mineral Fuels
Jammu And Kashmir
Ref. Document
Due on : 27 Apr, 2024
Supply of 3 Client Pcs Q3
#TBD : 31647906
8 Days Left
Water Supply And Drainage
Jammu And Kashmir
13.86 Lacs
Due on : 29 Apr, 2024
Stabilization Of Rwm Of Wss Malpora Mangalpora Brawrie Feeding Transit Camp At Fci Godown Mir-Bazar And Construction Of Approach Road Leading To Service Reservior Tankipora During Yatra Under Sanjay 2024-25
#TBD : 31647888
8 Days Left
Water Supply And Drainage
Jammu And Kashmir
2.83 Lacs
Due on : 29 Apr, 2024
Construction Of 0.05 Lac Gallons Rcc Sump At Lower Munda For Security Establishments During Yatra Under Sanjay 2024-25
#TBD : 31637299
8 Days Left
Power Plant
Jammu And Kashmir
3.50 Lacs
Due on : 29 Apr, 2024
Installation Of Street Lights On Existing Lt Poles At Yatra Base Camp Mirbazar And Walnut Factory Qazigund And Their Dismantling After Culmination Of Yatra And Back Carriage To Divisional Workshop For Sanjy 2024