#TBD : 32720513
0 Days Left
Construction
Madhya Pradesh
Ref. Document
Due on : 14 Sep, 2024
Supply of Toilet Cleaners Powder As Per Is 13760 Q4 Household Disinfectants Or Disinfectant Fluids Phenolic Type As Per Is 1061 Q3 Floor Cleaner V2 Q4 Toilet Cleaner Liquid As Per Is 7983 Q4
#TBD : 33991309
0 Days Left
Water Supply And Drainage
Madhya Pradesh
41.44 Lacs
Due on : 24 Feb, 2025
Drilling Of 200 Mm Dia 180 M Deep Odinery Tubewells In Various Villages Of Block Parasia Of Division Parasia District Chhindwara Under Jal Jivan Mission. Tubewells 30 Nos.
#TBD : 33738481
0 Days Left
Water Supply And Drainage
Madhya Pradesh
23.17 Lacs
Due on : 20 Jan, 2025
Mining Work Of 120M Deep Telescopic Tubewell Of 200/-150/125Mm
#TBD : 33632905
0 Days Left
Construction
Madhya Pradesh
Ref. Document
Due on : 02 Jan, 2025
Supply of Outdoor Twin Waste Bin Q3
#TBD : 33883774
0 Days Left
Non Diversified
Madhya Pradesh
Ref. Document
Due on : 11 Feb, 2025
Supply Of Bunk Bed Mattress Q3, Pillows - Synthetic Q3, Wool / Polypropylene Blended Blankets As Per Is 12848 Q3, Bed Sheets - Handicraft Q3, Pillow Covers Khadi Q3, Kurta, Salwar, Dupatta, Socks, Lower, Tshirt, School Bag, Copy 96 Page, Copy 248 Page, Rough Copy 300 Page, Pen Blue, Pen Pouch, Pencil, Rubber, Cover Roll, Cutter, Scale Big
#TBD : 34136302
0 Days Left
Construction
Madhya Pradesh
Ref. Document
Due on : 19 Mar, 2025
Supply of Toilet Cleaners Powder As Per Is 13760 Q4
#TBD : 32153979
0 Days Left
Construction
Madhya Pradesh
Ref. Document
Due on : 19 Jul, 2024
Supply of 2 Hopper Tipper Dumper Version 2 Q3
#TBD : 33101350
0 Days Left
Construction
Madhya Pradesh
Ref. Document
Due on : 25 Oct, 2024
Operation And Maintenance Of Water Supply Systems - Supply Of Water Works And Other Material As Per Required Demand
#TBD : 34136628
0 Days Left
Construction
Madhya Pradesh
Ref. Document
Due on : 19 Mar, 2025
Supply of Disinfectant Fluids Phenolic Type V3 Conforming To Is 1061 Q3 Toilet Cleaner Liquid V2 Conforming To Is 7983 Q4
#TBD : 31267409
0 Days Left
Construction
Madhya Pradesh
5.00 Lacs
Due on : 09 Mar, 2024
Refabrication Of Shav Vahan Q3