#TBD : 32336011
16 Days Left
Enviromental/forest Division
Assam
35.40 Lacs
Due on : 13 Aug, 2024
Supply Of Elephant Feed For Departmental Captive Elephant Under Pobitora Wildlife Sanctuary For A Period Of 365 Days
#TBD : 32308792
8 Days Left
Building Work
Assam
2.00 Crore
Due on : 05 Aug, 2024
Construction Of 02 Nos Drain Under Nagaon Mb Against The Scheme Of Infrastructure Development In The Ulbs.
#TBD : 32278978
3 Days Left
Canal/irrigation/dam Work
Assam
7.41 Crore
Due on : 31 Jul, 2024
Anti Erosion Measures To Protect Both Bank Of River Killing From Erosion At Different Reaches Ph-I.
#TBD : 32267636
0 Days Left
Canal/irrigation/dam Work
Assam
Ref. Document
Due on : 24 Jul, 2024
Supply Of Type B Geobags Along With Type C And Type A Polyester Bags As Reserved Stocks To Be Used For Emergency Works Morigaon And Kamrup
Package No. G-11A
#TBD : 32205636
10 Days Left
Construction
Assam
2.62 Crore
Due on : 07 Aug, 2024
Construction Of Bridge In Nagaon District I. Br. On Chapanala Bhoraguri Link Road Construction Of Bridge In Nagaon District I. Br. On Chapanala Bhoraguri Link Road
#TBD : 32181387
0 Days Left
Construction
Assam
86.36 Lacs
Due on : 15 Jul, 2024
Construction Of Spt Br. No. 3/1 On Taptola To Barunguri Beel Under Sopd G For The Year 2020-21
#TBD : 32181986
0 Days Left
Construction
Assam
69.50 Lacs
Due on : 15 Jul, 2024
Repairs And Maintenance Morigaon To Moirabari Road Under Pmgsy In E-Marg For The Year 2023-24
#TBD : 32155432
0 Days Left
Construction
Assam
3.57 Crore
Due on : 18 Jul, 2024
Construction Of Road From Singaherua To Dhupguri Jalakiabori, Polahjuri To Sorusala Road And Falihamaripam To Falihamari-Pathar Near Mv School Including Four Years Maintenance Under Mmppna For The Year 2023-24 In Morigaon District Maint/Mmppna/2023-24/135
#TBD : 32119272
0 Days Left
Power Plant
Assam
20.00 Lacs
Due on : 18 Jul, 2024
Supply, Erection, Testing And Commissioning Of 132Kv Circuit Breaker, 132Kv Ct And 132Kv Cvt Including Foundation Works For Cvt At 132Kv Baghjap Gss For 132Kv Sonapur Bay Ii.
#TBD : 32074700
0 Days Left
Canal/irrigation/dam Work
Assam
3.73 Crore
Due on : 06 Jul, 2024
Protection Of B/Dyke At Downstream Of Muwamari Butting Point From The Erosion Of River Brahmaputra Including Construction Of Retirement Recast.