#TBD : 34982719
6 Days Left
Power
Punjab
Ref. Document
Due on : 07 Aug, 2025
Procurement Of Spares Of Oil Supply Unit Installed At Hpbp System Of 2x210 Mw And 2x250 Mw Units Of Stage-i And Ii At Ghtp, Lehra Mohabbat
#TBD : 34982820
0 Days Left
Power
Punjab
Ref. Document
Due on : 01 Aug, 2025
Procurement Of Caustic Soda Lye 47.5 Percent For Ggsstp, Ropar For Fy 2025-26. Total Quantity As Per Nit Procurement Of Caustic Soda Lye 47.5 Percent For Ggsstp, Ropar For Fy 2025-26.
#TBD : 34982600
0 Days Left
Power
Punjab
Ref. Document
Due on : 01 Aug, 2025
Routine, Breakdown, Preventive Maintenance And Overhauling Jobs Mechanical Works Of Turbine, Generator And Their Auxiliaries, Hpbp, Lpbp, Regenerative System, Condenser, Piping, Valves Etc Of Ghtp, Lehra Mohabbat
#TBD : 34978159
4 Days Left
Power
Punjab
Ref. Document
Due on : 05 Aug, 2025
Procurement Of Power And Control Cables For Stage-i And Ii Of Chp. Total Quantity As Per Nit.
#TBD : 34978393
6 Days Left
Power
Punjab
Ref. Document
Due on : 07 Aug, 2025
Reconditioning Of Boiler Feed Pumps Cartridge Type - Fk6d30 Including Supplyof Required Spares Of Bfps Installed At Ghtp Lehra Mohabbat .
#TBD : 34938160
0 Days Left
Security Services
Punjab
84.59 Lacs
Due on : 28 Jul, 2025
Special Repair To Central Heating System Along With Connected Items Installed At Age E/m-ii Under Aor Of Ge 865 Ews
#TBD : 34891622
19 Days Left
Financial Services
Punjab
6.12 Lacs
Due on : 20 Aug, 2025
Gem Bids For Custom Bid For Services - Transportation Of Security Inks By Airway
#TBD : 34824961
10 Days Left
Power
Punjab
Ref. Document
Due on : 11 Aug, 2025
Repair Of Roads In Chp Area Of Ghtp Lehra Mohabbat
#TBD : 34819760
0 Days Left
Power
Punjab
Ref. Document
Due on : 01 Aug, 2025
Piping, Valves Etc. Of 2x210 Mw Stage-i And 2x250 Mw Stage-ii, Ghtp, Lehra-mohabbat And Mtc. Work Of Acs/ros Systems Etc. Gndtp, Bathinda Falling Under Mechanical Aux. Mtc. Cell On Lump-sum Basis. Round The Clock Operation, Maintenance And Overhauling Of Central Ac Plants Of Ucb, 220 Kv Switchyard Control Room, Package Ac Plants, Air Washer Systerms And Maintenance And Overhauling Of Window/split Acs, Water Coolers, Ros, All Connected
#TBD : 34779701
0 Days Left
Power
Punjab
Ref. Document
Due on : 28 Jul, 2025
Procurement Of Rubber Pads For Wagon Tipplers Stage-i And Ii. Total Quantity As Per Nit.