#TBD : 31645467
0 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 25 Apr, 2024
Supply And Installation Of 01 Nos. Anti-Rotation Device To Stop Reverse Rotation Of Ct Fans Installed At Unit 8 And 9, Dtps
#TBD : 31583588
6 Days Left
Power Plant
Uttar Pradesh
50.0 Thousand
Due on : 01 May, 2024
Procurement Of Temperature Gun For Oandm Of Unit No. 8 And 9
#TBD : 31634339
5 Days Left
Power Plant
Uttar Pradesh
6.18 Lacs
Due on : 30 Apr, 2024
Preventive And Breakdown Maintenance Of Boiler Feed Pump, Booster Pump, Hydraulic Coupling, Condensate Extraction Pump And Vacuum Pumps Of Unit 8And9 Of Dtps
#TBD : 31580782
6 Days Left
Power Plant
Uttar Pradesh
4.67 Lacs
Due on : 01 May, 2024
Complete Overhauling, Replacement Of Hv Neutral Bushing Along With All Gaskets Of 10Mva, 132Kv/6.6Kv Russian Make 9T Transformer
#TBD : 31620178
0 Days Left
Power Plant
Uttar Pradesh
19.48 Lacs
Due on : 25 Apr, 2024
Preventive And Breakdown Maintenance Of Fgd, Scr And Awrs System And Round The Clock Routine Operation Of Epms Of Esp System Of 1X660mw Htps
#TBD : 31617320
18 Days Left
Power Plant
Uttar Pradesh
1.32 Lacs
Due on : 13 May, 2024
Procurement Of Oxygen O2 Gas Filled Departmental Cylinders
#TBD : 31593055
11 Days Left
Power Plant
Uttar Pradesh
3.94 Lacs
Due on : 06 May, 2024
Supply Of Ms Erw Pipe For Ash Handling Plant
#TBD : 31593563
11 Days Left
Power Plant
Uttar Pradesh
10.74 Lacs
Due on : 06 May, 2024
Supply Of Screen Plate And Breaker Plate For Crusher Of Coal Handling Plant
#TBD : 31611261
0 Days Left
Power Plant
Uttar Pradesh
8.65 Lacs
Due on : 22 Apr, 2024
Construction Of Shede With Providing And Layng Interlocking Conc. Paver Block For Car / Bike Parking Outer Side Of Plant Boundry Near Cisf Main Gate And Construction Of Shed Above Main Gate Of Htps
#TBD : 31624685
18 Days Left
Power Plant
Uttar Pradesh
18.89 Lacs
Due on : 13 May, 2024
Procurement Of Spares - Helical Gear Set Assembly Stage Shaft, Disc, Spiral Bevel Gear Set For Cooling Tower