#TBD : 31547117
15 Days Left
Panchayat Division
Uttar Pradesh
Ref. Document
Due on : 13 Apr, 2024
Supply of 1 Open Bucket Loader Q3
#TBD : 31538520
3 Days Left
Agricultural And Floriculture And Silviculture Products
Uttar Pradesh
Ref. Document
Due on : 01 Apr, 2024
Supply of 20 Moisture Analyser Q3
#TBD : 31527532
0 Days Left
Construction
Uttar Pradesh
3.62 Crore
Due on : 28 Mar, 2024
Renewal With B. C. At Etah Kasganj Road To Amarpur Ghaat Via Kasganj Amanpur Road In Km 1, 2, 3, 4, 5, 6800, 7, 8580, 9, 10, 21, 22, 23, 24, 25, 26130 With H.M.P.
#TBD : 31510570
8 Days Left
Panchayat Division
Uttar Pradesh
Ref. Document
Due on : 06 Apr, 2024
Supply of 21 A Complete Installation G. I. Octagonal Pole With Led Light Q3
#TBD : 31511504
8 Days Left
Education And Research Institutes
Uttar Pradesh
Ref. Document
Due on : 06 Apr, 2024
Supply Of Lab Items, 7 Single Stage Reciprocating Air Compressor Rotary Air Compressor Flash Point Apparatus Nestler Boiler Model Surface Condensor Model Heat Transfer Apparatus For Natural Convection Multicylinder Four Stroke Petrol Engine Test Rig Morse Test
#TBD : 31503054
4 Days Left
Building Work
Uttar Pradesh
23.25 Lacs
Due on : 02 Apr, 2024
Construction Of Vivechana Room At Police Station Dholna Distt
#TBD : 31492295
8 Days Left
Health Services/equipments
Uttar Pradesh
Ref. Document
Due on : 06 Apr, 2024
Supply of 7 X Ray Film Q3
#TBD : 31444539
4 Days Left
Water Supply And Drainage
Uttar Pradesh
22.15 Crore
Due on : 02 Apr, 2024
Construction Of Oht Pump House Boundary Wall And Gate Site Develp Staff Quarter Supply And Laying Jointing Of Rising Main Distr System Tws Plc Scada Automation Repairing Of Existing Oht And Cwr Comm Testing Trial Run Hand Over To Npp Kasganj Distt Npp Water Supply Scheme District Under Amrut 2.0 Programme
#TBD : 31446132
4 Days Left
Warehousing And Storage
Uttar Pradesh
Ref. Document
Due on : 02 Apr, 2024
Nfsa Single Stage Handling And Transport Work For Block Amanpur
#TBD : 31446491
4 Days Left
Warehousing And Storage
Uttar Pradesh
Ref. Document
Due on : 02 Apr, 2024
Nfsa Single Stage Handling And Transport Work For Block Soron