#TBD : 34986799
3 Days Left
Construction
Himachal Pradesh
3.80 Lacs
Due on : 04 Aug, 2025
Construction Of Rccp In Extended Portion Restoration Of Rain Damages On Hamirpur Sujanpur Road Km. 2/600 To 16/00
#TBD : 34987352
3 Days Left
Construction
Himachal Pradesh
1.43 Lacs
Due on : 04 Aug, 2025
Construction Of V Shape Drain Including Edge Wall In Cc 1 3 6 Various Reaches And Cement Concrete 1 2 4 In Solied Causeway At Rd 0/955 To 0/958 Deposit Work Construction Of Link Road To Village Jangle Khas
#TBD : 34986909
3 Days Left
Construction
Himachal Pradesh
8.28 Lacs
Due on : 04 Aug, 2025
Sh Geo Tech Investigation Construction Of 122.511m Long Span Bridge Over Bakkar Khad At Rd 7.350 On Barara To Bakkar Khad Road Via Patnaun From Km 0.00 To 7.875 `
#TBD : 34986825
3 Days Left
Construction
Himachal Pradesh
3.02 Lacs
Due on : 04 Aug, 2025
Providing Laying Solid Causeway At Rd. 0/065 To 0/095 Under Relief Fund Restoration Of Rain Damages On Ghs Karer To Gopal Krishan Gowshala Galoh Km. 0/0 To 1/200
#TBD : 34987359
5 Days Left
Canal/irrigation/dam Work
Himachal Pradesh
2.13 Lacs
Due on : 06 Aug, 2025
Shifting And Relaying Of Gravity Main From Keharwin Tank To Keharwin Village And Parol Tank To Parol Village Distribution Line Of Various Dia. Restoration Of Rain Damage To Lwss Aman
#TBD : 34987023
3 Days Left
Construction
Himachal Pradesh
7.79 Lacs
Due on : 04 Aug, 2025
Providing Laying Cement Concrete Pavement From Rd 0/300 To 0/455 R/wall Between Rd 0/540 To 0/556 Under Otmnp C/o Link Road From Basantpur To Tauni Devi Via Chahar Km. 0/00 To 1/00
#TBD : 34987154
3 Days Left
Construction
Himachal Pradesh
1.43 Lacs
Due on : 04 Aug, 2025
Construction Of V Shape Drain Including Edge Wall In Cc 1 3 6 Various Reaches And Cement Concrete 1 2 4 In Solied Causeway At Rd 0/955 To 0/958 Deposit Work Construction Of Link Road To Village Jangle Khas
#TBD : 34987313
4 Days Left
Construction
Himachal Pradesh
20.36 Crore
Due on : 05 Aug, 2025
Construction Of Building Portion Including Water Supply Sanitary Installation, Septic Tank, Rain Water Harvesting System, Approach Road Site Developemnt Etcetera.
#TBD : 34987001
3 Days Left
Construction
Himachal Pradesh
4.26 Lacs
Due on : 04 Aug, 2025
Construction Of V-shape Drain And Hard Shouldering At Rd. 0/300 To 0/0435lhs 0/360 To 0/435rhs P/l 250mm Dia Rcc Hume Pipe At Rd. 0/240 To 0/316.60 150mm Duia Rcc Hume Pipe In Between Km. 0/316.60 To 0/331.60 Under Relief Funds Restoration Of Rain Damages On Bhota Sidhpur Tal Road Km. 0/0 To 3/0
#TBD : 34987082
5 Days Left
Canal/irrigation/dam Work
Himachal Pradesh
3.28 Lacs
Due on : 06 Aug, 2025
Providing Of Multipurpose Accessories Imp Of Various Lwss By Construction Of Ohsr Imp Of Distribution System