#TBD : 31660739
13 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 09 May, 2024
Supply of Brake Beam Inner And Outer To Icf Drg.No. Dmu/Dpc5-3-2-505, Alt- B/Nil, Col-I, Qty-01 N O. Without Nylon Bushes Wherever Applicable And Dmu/Dpc5-3-2-504, Alt-A/Nil, Col-I, Qty-01 No. With Out Nylon Bushes Wherever Applicable. Material And Specification As Per Drawing As Per Drg.No. Dmu/Dpc5- 3-2-505, Alt- B/Nil, Col-I And Dmu/Dpc5-3 Specn: As Per Drawing Warranty Period: 30 Months After The Da Te Of Delivery
#TBD : 31597320
0 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 15 Apr, 2024
Supply of Plastic Crates Or Fruits And Vegetable As Per Is 15532 Q3
#TBD : 31660818
12 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 08 May, 2024
Supply of Strainer Suction As Per Cummins Pt No-3876063 Suitable For 1400 Hhp Demu Dpc. Warranty Period: 30 Months After The Date Of Delivery
#TBD : 31597330
0 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 15 Apr, 2024
Supply of Kitchen Chimney Q3
#TBD : 31654717
4 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 30 Apr, 2024
Supply of Quick Exhaust Valve Schunk Part No - 909010007700 Drg No - Xg353a041vtpl22383 Warranty Period: 30 Months After The Date Of Delivery
#TBD : 31632568
0 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 26 Apr, 2024
Supply of 4 Handheld Electric Blower Q4
#TBD : 31614139
0 Days Left
Railway Transport
Maharashtra
11.56 Lacs
Due on : 19 Apr, 2024
Monthly Basis Cab & Taxi Hiring Services - Suv; 3000 Km X 364 Hours; Outstation 24*7
#TBD : 31598407
0 Days Left
Air Transport
Maharashtra
21.02 Lacs
Due on : 23 Apr, 2024
Noise Mapping And Declaration Of Airport Noise Zones At Birsi Airport
#TBD : 31654799
4 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 30 Apr, 2024
Supply of Traction Motor Junction Box For Tm # 2, 4 As Per M/S. Medha Part No. Sp675m101039 For 3 Phase Memu Type Mae675m. Warranty Period: 30 Months After The Date Of Delivery
#TBD : 31621276
5 Days Left
Panchayat Division
Maharashtra
Ref. Document
Due on : 01 May, 2024
Supply And Installation Of Rodside Dustbin Q3 Supply Of E Garbage Collector In Grampanchayat Area Q3 Supply And Installation Of Solar Dual Pump System Q3 Supply And Installation Of Complete Ro Setup With Shed Q3