#TBD : 35365488
3 Days Left
Building Work
Meghalaya
26.67 Crore
Due on : 22 Sep, 2025
Construction Of M.P. Hall At Various Jnvs In The State Of Meghalaya
#TBD : 35369162
13 Days Left
Recreational Services
Meghalaya
28.83 Lacs
Due on : 02 Oct, 2025
Fabrication Of Exhibit Wooden Cabinets Strictly As Per Technical Specification And Drawings As Mentioned In The Tender Supply, Fabrication And Installation Of Exhibit Wooden Cabinets Of Illusion Gallery, At Shillong Science Centre, Shillong
#TBD : 35369303
8 Days Left
Security Services
Meghalaya
Ref. Document
Due on : 27 Sep, 2025
Provn Of Upgradation Of Nirman Hall And Toilet At Arc And Mc, Laitkor
#TBD : 35370344
8 Days Left
Security Services
Meghalaya
3.89 Crore
Due on : 27 Sep, 2025
Provision Of Road And River Protection Wks Alongside River Bank From Near Mahila Barrack To War Memorial Bridge And Compound Wall Alongside Nirman Lake At Laitkor Garrison
#TBD : 35370739
5 Days Left
Survey Work
Meghalaya
1.70 Lacs
Due on : 24 Sep, 2025
Tender For Procurement Of Steel Wire Rope For Gsi Ner Shillong Procurement Of Steel Wire Rope
#TBD : 35370866
5 Days Left
Security Services
Meghalaya
Ref. Document
Due on : 24 Sep, 2025
Gem Bids For Led Bulb With Battery As Per Is 16102 Q3
#TBD : 35354882
3 Days Left
Warehousing And Storage
Meghalaya
Ref. Document
Due on : 22 Sep, 2025
Supply And Installation Of It Hardware And Software
#TBD : 35354888
11 Days Left
Building Work
Meghalaya
12.69 Crore
Due on : 30 Sep, 2025
Construction Of Heliport At Shillong Including Infrastructure On Engineering, Procurement And Construction Epc Mode 3 Basis In New Shillong Township
#TBD : 35354931
4 Days Left
Power Plant
Meghalaya
23.04 Crore
Due on : 23 Sep, 2025
Development Of Distribution Infrastructure For Additional Household Electrification In South Khasi Hills Distribution Division Package-iii
#TBD : 35355794
7 Days Left
Power Plant
Meghalaya
Ref. Document
Due on : 26 Sep, 2025
Design And Supply Of Distribution Transformers Of 11/0.433 Kv 25kva, 63kva, 100kva, 200kva, 250kva And 500kva For Reputed Firms. For Startup Firms Only 25kva And 63kva