#TBD : 34977466
27 Days Left
Power Plant
Meghalaya
3.36 Lacs
Due on : 28 Aug, 2025
Gem Bids For Earthing Powder (q3)
#TBD : 34977499
27 Days Left
Power Plant
Meghalaya
3.19 Lacs
Due on : 28 Aug, 2025
Gem Bids For Ground Enhancement Material (q3)
#TBD : 34759656
0 Days Left
Security Services
Meghalaya
3.41 Lacs
Due on : 09 Jul, 2025
Construction Of 08 Nos Acp Shelter At Bop Rattachera 02 Nos Dona 02 Nos Lamasakhi 02 Nos Khuliang 01 Nos And Laijuri 01 Nos In Aor Of 172 Bn Bsf Under Shq Bsf Jowai Sh Pvdg Iei Fans And Service Connection
#TBD : 34764205
0 Days Left
Security Services
Meghalaya
3.41 Lacs
Due on : 09 Jul, 2025
Construction Of 08 Nos Acp Shelter At Bop Rattachera 02 Nos Dona 02 Nos Lamasakhi 02 Nos Khuliang 01 Nos And Laijuri 01 Nos In Aor Of 172 Bn Bsf Under Shq Bsf Jowai Sh Pvdg Iei Fans And Service Connection
#TBD : 34592567
0 Days Left
Canal/irrigation/dam Work
Meghalaya
1.37 Crore
Due on : 02 Jul, 2025
Construction Of Training Hall-Cum-Mechanical Workshop For The Departmental Custom Hiring Centre At Khliehriat, East Jaintia Hills District
#TBD : 34566769
0 Days Left
Security Services
Meghalaya
6.77 Lacs
Due on : 17 Jun, 2025
Construction Of 02 Nos Surveillance Cum Op Shelter G1 At Bop Dona 02 Nos In Aor Of 172 Bn Bsf Under Shq Bsf Jowai Sh Pvdg Iei Fans And Service Connection And Off Grid Solar Plant
#TBD : 34564862
0 Days Left
Security Services
Meghalaya
7.17 Lacs
Due on : 17 Jun, 2025
Construction Of 02 Nos Surveillance Cum Op Shelter G 2 At Bop Lynghat 02 Nos In Aor Of 04 Bn Bsf Under Shq Bsf Jowai Sh Pvdg Iei Fans And Service Connection And Off Grid Solar Plant
#TBD : 34520903
0 Days Left
Power Plant
Meghalaya
Ref. Document
Due on : 30 May, 2025
Gem Bids For Monthly Basis Cab And Taxi Hiring Service - Without Fuel - Suv; Mahindra Bolero; 2021; As Per Tender Document; Ac; As Per Tender Document
#TBD : 34364848
0 Days Left
Power Plant
Meghalaya
14.72 Lacs
Due on : 10 May, 2025
Gem Bids For 20 Heavy Duty Longspan Storage System Q3 Pac Only
#TBD : 34023018
0 Days Left
Security Services
Meghalaya
10.08 Lacs
Due on : 03 Mar, 2025
Construction Of 03 Nos Surveillance Cum Op Shelter G 1 At Bop Laijuri 02 Nos And Bop Lailong 01 Nos In Aor Of 172 Bn Bsf Under Shq Bsf Jowai Sh Pvdg Iei Fans And Service Connection And Off Grid Solar Plant