#TBD : 31287302
0 Days Left
Railway Transport
Andhra Pradesh
Ref. Document
Due on : 26 Mar, 2024
Supply of Set Of Side Flanges Rh & Lh For Uic Type Rubber Vestibule Conforming To Rdso Specification No. Rdso/2007/Cg-05, Rev.01. Consisting Of 11 Items. Full Description Attached In Documents. Warranty Period: 60 Months After The Date Of Delivery
#TBD : 31056613
0 Days Left
Shipping Transport
Andhra Pradesh
6.03 Lacs
Due on : 28 Feb, 2024
Operation & Maintenance & Cleaning Up-Keeping Of Pay & Use Toilet Block At Beyt Passenger Jetty At Beyt
#TBD : 31042064
0 Days Left
Power Plant
Andhra Pradesh
10.00 Lacs
Due on : 21 Feb, 2024
Erection & Maintenance Of Ht, Lt Lines & T/C’S, Meter Installation,
Disconnnection/Re.Connection & Meter Replacement, All Schemes Work Satapar Side For Bhatiya Sdn
#TBD : 31015819
0 Days Left
Water Supply And Drainage
Andhra Pradesh
7.04 Lacs
Due on : 26 Feb, 2024
Gullyplug Nos.-01, Farm West Weir.-10 Nos Parcolation Tank With Recharga Structure.-01 Nos. At Village-Tankariya, Ta-Kalyanpur
#TBD : 30982304
0 Days Left
Canal/irrigation/dam Work
Andhra Pradesh
38.59 Lacs
Due on : 22 Feb, 2024
Construction Of Box Culvert On Virdi Vokalo Near Village Raval In Kalyanpur Taluka
#TBD : 30920810
0 Days Left
Water Supply And Drainage
Andhra Pradesh
3.47 Crore
Due on : 02 Mar, 2024
Design, Construction And O & M Of Providing, Supplying, Lowering, Laying And Jointing 200Mm Di K-7 Rising Main Pipelines, Pump House, Supplying And Erecting Pumping Machinery At Vasai Shw Including Trial Run Of Three Months And With 10 Years Of O & M For Shivrajpur Beach
#TBD : 30890240
0 Days Left
Power Plant
Andhra Pradesh
9.90 Lacs
Due on : 09 Feb, 2024
Erection & Maintenance Of Ht Lt & Tc For Spa & Maintenance Scheme Under Town Sub Division Under Khambhalia Division.
#TBD : 30814820
0 Days Left
Water Supply And Drainage
Andhra Pradesh
8.40 Lacs
Due on : 14 Feb, 2024
Construction Of Recharge Structure-6 Nos At Village :-Mokhana Ta. Bhanvad
#TBD : 30427460
0 Days Left
Building Work
Andhra Pradesh
4.85 Lacs
Due on : 09 Jan, 2024
Construction Of Welcome Arch At Thimapuram Layout Id: 05120La111912 Of Thimapuram Village
#TBD : 30151050
0 Days Left
Power Plant
Andhra Pradesh
10.00 Lacs
Due on : 08 Dec, 2023
Erection & Maintenance Of Ht, Lt Lines & T/Cs, Meter Installation, Disconnnection/Re.Connection & Meter Replacement, Spa Scheme Work Hamusar Side For Okha Sdn