#TBD : 31652696
8 Days Left
Education And Research Institutes
Orissa
Ref. Document
Due on : 06 May, 2024
Supply of Vehicle Lift Q2
#TBD : 31169425
0 Days Left
Education And Research Institutes
Orissa
Ref. Document
Due on : 12 Mar, 2024
Supply of Machineries For Mechanic Auto Body Painting Trade, 21 Arbor Press Hand Operated Belt Sander Narrow Surface Bench Lever Shears Compressed Air Line Discrete Component Trainer Basic Electronics Trainer Grinding Machine General Purpose Liquid Penetrant Inspection Kit Pipe Bending Machine Hydraulic Type Pneumatic Rivet Gun Random Dual Action Orbital Sander Spray Guns Gravity Feed Primer Tin Smiths Bench Folder Underbody Sealer And Corrosion Proofing Materials And Spray Units
#TBD : 31132276
0 Days Left
Road Work
Orissa
9.59 Lacs
Due on : 26 Feb, 2024
Shifting And Relocation Of Existing Electrical Ht And Lt Lines Of Ps Office To Kolasahi Via Baghua Chaulathali Due To Widening And Strengthening Of Road Under Barachana Section
#TBD : 30960178
0 Days Left
Education And Research Institutes
Orissa
Ref. Document
Due on : 16 Feb, 2024
Supply of 40 Desktop Computers Q2
#TBD : 30454331
0 Days Left
Power
Orissa
15.02 Lacs
Due on : 09 Jan, 2024
Repair Of Wiremesh Fencing Of Switchyard At 132/33Kv Grid Substation
#TBD : 29575885
0 Days Left
Canal/irrigation/dam Work
Orissa
3.08 Crore
Due on : 16 Oct, 2023
Excavation Of Narsinghpur Branch Canal From Rd 26.914 Km To Rd 27.245 Km With Missing Link For A Length Of 130 Meter Including Its Structures, Lining And Service Road And 4 Nos Additional Foot Bridge Within Rd 27.245 Km To Rd 30.210 Km Of Nbc Of Rrip.
#TBD : 29240825
0 Days Left
Education And Research Institutes
Orissa
Ref. Document
Due on : 25 Sep, 2023
Supply of 1 Online Ups V2 Q2
#TBD : 28773033
0 Days Left
Education And Research Institutes
Orissa
Ref. Document
Due on : 09 Aug, 2023
Supply of 10 Internal Micrometer As Per Is 2966 Q3
#TBD : 28759322
0 Days Left
Education And Research Institutes
Orissa
Ref. Document
Due on : 09 Aug, 2023
Supply of 10 External Micrometers Q3
#TBD : 28742377
0 Days Left
Education And Research Institutes
Orissa
Ref. Document
Due on : 08 Aug, 2023
Supply of 10 Angle Cutter Electric Q3