#TBD : 31699811
5 Days Left
Canal/irrigation/dam Work
Bihar
Ref. Document
Due on : 14 May, 2024
Supply Of 3.15 Mm Diameter Ba Wire
#TBD : 31652321
1 Days Left
Canal/irrigation/dam Work
Bihar
30.60 Lacs
Due on : 10 May, 2024
Hire Of 4 Nos High Capacity Diesel Operated Dewatering Pump Hp Capacity With Consumption Of Fuel For The Period Of 15 The June 2024 To 15Th Oct 2024 For Dewatering Rain Water From Inside Nirmali Ring Bund To Outer Side At Nirmali
#TBD : 31652725
1 Days Left
Canal/irrigation/dam Work
Bihar
13.19 Lacs
Due on : 10 May, 2024
Maintenance Of Afs Gate Of Western Afflux Bund, Western And Eastern Koshi Embankment And Visiting Of Dredging Work At 23.52 Km Of Eastern Afflux Bund During Flood Period 2024
#TBD : 31652729
1 Days Left
Canal/irrigation/dam Work
Bihar
2.06 Lacs
Due on : 10 May, 2024
Repair And Maintenance Of Afs Gates At 123.50 And 123.90 Km Of Eastern Koshi Embankment Before Flood 2024
#TBD : 31652309
1 Days Left
Canal/irrigation/dam Work
Bihar
27.85 Lacs
Due on : 10 May, 2024
Repair And Maintenance Of Afs Gates At Different Point And General Maintenance Of All Afs Gates Of Western Kishi Embankment, Western Afflux Bund And Mahuli Marginal Right Bank Before Flood 2024
#TBD : 31440948
0 Days Left
Canal/irrigation/dam Work
Bihar
Ref. Document
Due on : 12 Apr, 2024
Fabrication Of Model Trays Running Simulation Operation And Maintenance For 5 Years Of Kosi River And Kosi Barrage Models At Physical Modelling Centre Centre Of Excellence Birpur Supaul Bihar
#TBD : 31315247
0 Days Left
Canal/irrigation/dam Work
Bihar
14.69 Crore
Due on : 09 Mar, 2024
Anti Erosion Work Between Km.10.82 To Km. 0.00 Of Dalwa Ring Bundh Of Wke
#TBD : 31315190
0 Days Left
Canal/irrigation/dam Work
Bihar
3.37 Crore
Due on : 09 Mar, 2024
Anti Erosion Work In Loop Between Km. 9.18 Km. 9.79 Of Wke.
#TBD : 31315234
0 Days Left
Canal/irrigation/dam Work
Bihar
10.21 Crore
Due on : 09 Mar, 2024
Anti Erosion Work Between Loop Portion Of Dalwa Connecting Bundh From Ds2 To 0.00Km Of Dalwa Cut End, From 0.00 Km. Of Dalwa Ring Bundh To Spur Ds1 And Dalwa Cut End Of Wke ./ Hanuman Nagar Saptari Anti Erosion Work In Front Of Dalwa Cut End
#TBD : 31313881
0 Days Left
Canal/irrigation/dam Work
Bihar
5.61 Crore
Due on : 09 Mar, 2024
Anti Erosion Work At Spur At Km 26.00 Of Eab, Anti Erosion Work Between Km 26.40 To Km 26.88 Of Eab, Anti Erosion Work Between Km 26.88 To Km 27.40 Of Eab, Anti Erosion Work In U/S Of Spur At Km 27.40 Of Eab, Anti Erosion Work Of Loop Between Spur Km 27.88 To Km 28.35 To Eab