#TBD : 34797561
0 Days Left
Construction
Assam
4.68 Crore
Due on : 28 Jul, 2025
Mmppna Ridf Xxxi 25 26 21 Construction Of Road From I Arimoraghat Road To Majkachua From Ch.0.00M To 1640.00M Length 1.640 Km, Ii Maghnuwa To Jorhatia Road From Ch.0.00M To 1540.00M Length 1.540 Km, Iii Latabari Horimandir To Howajan Arimo
#TBD : 34797509
0 Days Left
Construction
Assam
3.35 Crore
Due on : 28 Jul, 2025
Mmppna Ridf Xxxi 25 26 23 Construction Of Road From I Basapukhuri To Mosondoiri Tiniali From Ch.0.00M To 1380.00M Length- 1.38 Km, Ii Kamalpur To Bharatpur From Ch.0.00M To 1930.00M Length- 1.93 Km, Iii Jajolial Namgarh To Jorhatia Shiv Man
#TBD : 34797309
0 Days Left
Construction
Assam
5.87 Crore
Due on : 28 Jul, 2025
Mmppna Ridf Xxxi 25 26 20 Construction Of Road From I Bikrampur To Dolin Basumatari Chuburi From Ch.0.00M To 1600.00M Length 1.60 Km, Ii Narayanpur Tatibahar Road To Singia Pwd Via Stadium From Ch.0.00M To 1890.00M Length 1.89 Km, Iii Lakhi
#TBD : 34631169
0 Days Left
Canal/irrigation/dam Work
Assam
29.69 Lacs
Due on : 23 Jun, 2025
Dredging Work For Cutting Of The Developed Sand Chars At Lachit Ghat Along The Brahmaputra River Towards Kamakhya Hills. Phase-ii.
#TBD : 34595721
0 Days Left
Railway Transport
Assam
Ref. Document
Due on : 09 Jun, 2025
Supply Of Tab. Ticagrelor 90mg.
#TBD : 34563219
0 Days Left
Industrial Development Agencies
Assam
32.72 Lacs
Due on : 25 Jun, 2025
Detailed Design, Engineering, Procurement, Construction, Erection, Testing And Commissioning Of Stp Of 30 Kld Capacity Including With 30 Days Of Trial-Run Period At Plastic Park, Tinsukia, Assam On Turnkey Basis
#TBD : 34563211
0 Days Left
Construction
Assam
2.80 Crore
Due on : 09 Jun, 2025
-Establishment, Construction, Supply And Procurement, Fabrication, Erection Of Machineries, Trial Run And Commissioning Of Material Recovery Facility Mrf And Waste To Compost W2c Plant At Bihpuria As Per Swm Rules 2016 Under Sbm U On Enginee Lmrc/Tender/2024-25/234
#TBD : 34473487
0 Days Left
Security Services
Assam
Ref. Document
Due on : 22 May, 2025
Term Contract For Br Work At Hq 7 Sect Ar Tuensang
#TBD : 34473801
0 Days Left
Security Services
Assam
Ref. Document
Due on : 22 May, 2025
Term Contract For Br Work At Hq 7 Sect Ar Tuensang
#TBD : 34473818
0 Days Left
Security Services
Assam
14.99 Lacs
Due on : 04 Jun, 2025
Repair/Maint Of Distribution Transformer, Dg Sets Incl Servicing, Centrifuging Incl Replacement Of Old End Termination Boxes Etc At Arch, Shokhuvi Nagaland