#TBD : 32363982
5 Days Left
Construction
Jammu And Kashmir
2.72 Lacs
Due on : 02 Aug, 2024
Construction Of Irrigation Khull From Ab Majeeb Mir To Onwards At Wahigund Under Iwmp For The Year 2024-25 Block Wailoo
#TBD : 32357789
17 Days Left
Security Services
Jammu And Kashmir
Ref. Document
Due on : 14 Aug, 2024
Supply of 24 Voltage Stablizer Vgmm500 Keyboard Wireless Mouse Wireless Ups Online 6 Kva Battery For Ups 26 Ah
#TBD : 32365576
19 Days Left
Security Services
Jammu And Kashmir
Ref. Document
Due on : 16 Aug, 2024
Supply of 1 Wooden Panelling Along With Flooring For Mobile Training Shelter
#TBD : 32358501
5 Days Left
Construction
Jammu And Kashmir
71.30 Lacs
Due on : 02 Aug, 2024
Permanent Restoration Of Road From Uri To Sukhdar Package No Jk03280, Length 4.85 Km
#TBD : 32360029
8 Days Left
Security Services
Jammu And Kashmir
Ref. Document
Due on : 05 Aug, 2024
Supply of 1100 Polyethylene Pipes For Water Supply Q4
#TBD : 32365391
19 Days Left
Security Services
Jammu And Kashmir
Ref. Document
Due on : 16 Aug, 2024
Supply of 65 Screw Bsw Wire Cooper Soft Cutting Pipe Wheels Paint Rfu Priming Red Oxide Paint Blue Wire Knobs Switch Plier Side Cutter
#TBD : 32363985
5 Days Left
Construction
Jammu And Kashmir
3.07 Lacs
Due on : 02 Aug, 2024
Construction Of Water Harvesting Tank In The L/O Mohd Akber War At Badipora Pyt Halqa Warpora Block Tangmarg Under Iwmp For Year 2024 -25
#TBD : 32365504
19 Days Left
Security Services
Jammu And Kashmir
Ref. Document
Due on : 16 Aug, 2024
Supply of 1 Eqpt Racks In Training Shelter With Electrical And Comn Cable Fitting
#TBD : 32358266
5 Days Left
Construction
Jammu And Kashmir
49.40 Lacs
Due on : 02 Aug, 2024
Permanent Restoration Of Road From Shahdara To Jabda Package No Jk03281, Length 5.7 Km Restoration Of Road From Shahdara To Jabda
#TBD : 32364136
5 Days Left
Construction
Jammu And Kashmir
1.65 Lacs
Due on : 02 Aug, 2024
Construction Of Irrigation Khull Of Chopan Mohalla At Wahigund Under Iwmp For The Year 2024-25 Block Wailoo