#TBD : 34989627
19 Days Left
Power Plant
Jammu And Kashmir
29.23 Lacs
Due on : 20 Aug, 2025
Gem Bids For Custom Bid For Services - Hiring Of 10 Kl Capacity Watertanker Along With Driver For Dam Site Gurez Bandipora For 2years Pkg-546
#TBD : 34990794
1 Days Left
Construction
Jammu And Kashmir
Ref. Document
Due on : 02 Aug, 2025
Engagement Of Consultant For Preparation Of Detailed Project Reports Survey Of Roads Site Inspection Of Bridges And Buildings Including Structural Design Architectural Drawings / Plan Soil Investigation, Detailed Estimates, Bill Of Quantities Along W
#TBD : 34959896
10 Days Left
Enviromental/forest Division
Jammu And Kashmir
3.29 Lacs
Due on : 11 Aug, 2025
Installation/Fixing Of Pine Needle Check Dams To Arrest The Surface Soil Erosion In Co. 145/Kh, 146/Kh And 147/Kh, Ajas Range, Bandipora Forest Division Under Campa Npv For The Year 2025-26.
#TBD : 34960663
0 Days Left
Construction
Jammu And Kashmir
28.05 Lacs
Due on : 30 Jul, 2025
Construction Of Internal Roads With Side Drain At Swm Mc Sumbal.
#TBD : 34960731
0 Days Left
Security Services
Jammu And Kashmir
9.62 Lacs
Due on : 01 Aug, 2025
Consultancy Construction Of 05 Storied Barrack Block For P/P Noorbagh And 03 Bhk Quarters For Upper Sub-Ordinate Office In Dpl Bandipora
#TBD : 34964235
17 Days Left
Power Plant
Jammu And Kashmir
5.15 Lacs
Due on : 18 Aug, 2025
Gem Bids For Custom Bid For Services - Repair Of Alstom Presently Gemake Protection Relays Installed At Kishanganga Power Station Bandipora
#TBD : 34965743
17 Days Left
Power Plant
Jammu And Kashmir
28.84 Lacs
Due on : 18 Aug, 2025
Gem bids for Custom Bid For Services - Annual Maintenance Of Two Noshydro Generating Units Pelton Turbine Of 3X110 Mwkishanganga Power Station J And K Pkg 545 /
#TBD : 34920807
3 Days Left
Power Plant
Jammu And Kashmir
Ref. Document
Due on : 04 Aug, 2025
Gem bids for Purchase Of 09 Nos Vacuum Interrupters Installed In M/Sbhel Make 11 Kv Breaker At Kgps, Bandipora
#TBD : 34927323
0 Days Left
Security Services
Jammu And Kashmir
2.50 Crore
Due on : 31 Jul, 2025
Construction Construction Of 03 Storied Barrack For Jawans At Pc Bandipora Under Account Head Building N Structures In Demand -51 Police
#TBD : 34927764
3 Days Left
Enviromental/forest Division
Jammu And Kashmir
2.53 Lacs
Due on : 04 Aug, 2025
Construction Of 40 No. Demarcation Boundary Pillars As Per Approved Design Along The Forest Demarcation Line Chakline B.ps Only As Per The Mapin Forest Buthoo Panar Of Bandipora Forest Division Chitternar