#TBD : 31628477
0 Days Left
Power Plant
Uttar Pradesh
2.00 Lacs
Due on : 22 Apr, 2024
Electrification/Construction/Extension Of H.T. & L.T. Line And Different Capacity Of 11/0.4 Kv S/S In Rampur/Mahadev Hindu Nagar/Devrawan/ Semrahan Sisai/ Tenduwa/Bhaksaniya/ Gidhur/Shekhdeeh Under The Head Of Deposit Scheme-2024-25, Under The Giographical Area Of Edd
#TBD : 31536662
0 Days Left
Agricultural/floriculture/silviculture Products
Uttar Pradesh
Ref. Document
Due on : 27 Mar, 2024
Handling Of Wheat Purchase For 2024-25 Centre Srinagar Distt
#TBD : 31542406
0 Days Left
Power Plant
Uttar Pradesh
3.00 Lacs
Due on : 30 Mar, 2024
Providing 01 Diesel Generator With Operator Of 5.0 Kva For The Office Of Ee, Etd-Rampur, 01 No. Diesel Generator With Operator Of 5.0 Kva For The Office Of Assistant Engineer Meter, Etl-I, Rampur, 01 No. Diesel Generator With Operate
#TBD : 31617873
0 Days Left
Banking And Mutual Funds And Leasings
Uttar Pradesh
Ref. Document
Due on : 20 Apr, 2024
Interior Furnishing And Electrical And Data Network Cabling Work At Current Premises Of Imiliya Branch
#TBD : 31635233
4 Days Left
Power Plant
Uttar Pradesh
10.00 Lacs
Due on : 02 May, 2024
Shifting Of Lines/Increasing Capacity Etc. Under Deposit Scheme In Future For Cfy 2024-25 Under Jurisdiction Of Edd-Ii
#TBD : 31536659
0 Days Left
Agricultural/floriculture/silviculture Products
Uttar Pradesh
Ref. Document
Due on : 27 Mar, 2024
Handling Of Wheat Purchase For 2024-25 Centre Tulsipur Distt
#TBD : 31555754
0 Days Left
Power Plant
Uttar Pradesh
12.30 Lacs
Due on : 02 Apr, 2024
Necessary Work Related To Boundary Wall Strengthening And Fencing At 33/11 Kv Power Sub-Station Katra Rural And Urlehwa
#TBD : 31628580
0 Days Left
Power Plant
Uttar Pradesh
17.40 Lacs
Due on : 22 Apr, 2024
Electrification/Construction/Extension Of H.T. & L.T. Line And Different Capacity Of 11/0.4 Kv S/S In Different Location 54 Under The Head Of Deposit Scheme-2024-25, Under The Giographical Area Of Edd Tulsipur.
#TBD : 31551271
0 Days Left
Power Plant
Uttar Pradesh
19.99 Lacs
Due on : 29 Mar, 2024
Extension And Maintenance Work Of The Office Building Of Electricity Distribution Sub-Division Utraula, District
#TBD : 31628622
0 Days Left
Power Plant
Uttar Pradesh
16.68 Lacs
Due on : 22 Apr, 2024
Electrification/Construction/Extension Of H.T. & L.T. Line And Different Capacity Of 11/0.4 Kv S/S In Different Location 58 Under The Head Of Deposit Scheme-2024-25, Under The Giographical Area Of Edd Tulsipur.