#TBD : 28817561
0 Days Left
Construction
Madhya Pradesh
Ref. Document
Due on : 04 Aug, 2023
Supply of 10000 Stable Bleaching Powder For Treatment Of Water Intended For Drinking As Per Is 1065 Part 2 Q3
#TBD : 26841351
0 Days Left
Civil Work
Madhya Pradesh
Ref. Document
Due on : 06 Feb, 2023
Supply of E Cart Tiping Faciliti, 1 Title1
#TBD : 24730118
0 Days Left
Water Supply And Drainage
Madhya Pradesh
3.77 Crore
Due on : 13 Jul, 2022
Design And Construction Of New Water Supply Schemes Under Jal Jivan Mission At Village 1.Jalod Sanjar 2.Birakhedi 3.Pachlanabil 4.Rawadiyapeer 5.Jandla Of Block
#TBD : 26331392
0 Days Left
Power Plant
Madhya Pradesh
Ref. Document
Due on : 30 Dec, 2022
Supply of 0010 M5144906015 As55b210cfo-Sphp : Bladder - Accumulator Q3, 0020 M5144906027 As55b35cfo- Splp : Bladder- Accumulator Q3
#TBD : 28824908
0 Days Left
Construction
Madhya Pradesh
Ref. Document
Due on : 04 Aug, 2023
Supply of 30 Alumino - Ferric Ferric Alum For Bulk Supply As Per Is 299 Q3
#TBD : 28837034
0 Days Left
Canal/irrigation/dam Work
Madhya Pradesh
32.10 Lacs
Due on : 08 Aug, 2023
Construction Of Check Dam Bhartari Gowerdhanpur Block Ambiyapur Distt
#TBD : 24730193
0 Days Left
Water Supply And Drainage
Madhya Pradesh
4.59 Crore
Due on : 13 Jul, 2022
Design And Construction Of New Water Supply Schemes Under Jal Jivan Mission At Village 1. Ordi 2. Ajdawada 3. Badganwa 4. Maloda 5. Limbas Of Block
#TBD : 24820894
0 Days Left
Construction
Madhya Pradesh
Ref. Document
Due on : 16 Jul, 2022
Supply of Mud Pump Cum Jetting Machine
#TBD : 28853499
0 Days Left
Construction
Madhya Pradesh
Ref. Document
Due on : 07 Aug, 2023
Supply of 1 Hopper Tipper Dumper Version 2 Q3
#TBD : 24730346
0 Days Left
Panchayat Division
Madhya Pradesh
3.82 Lacs
Due on : 07 Jul, 2022
Providing And Erecting Of Highmast Led At Buddha Vasti Smashanbhumi At Ward No 17 For N P